Permit: T18CM06066
Permit Details
Apply Date:
08/06/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
RAYHEON ETF
Contractors:
- BRASFIELD AND GORRIE L L C , *** APA ***
Permit Reviews
Permit Number - T18CM06066
Permit Status: C of o
Permit Description: RAYHEON ETF
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/06/2018 | PLANS OK TO SUBMIT - COMM | 08/06/2018 | COMPLETED |
08/13/2018 | 3RD PARTY REVIEW - COMMERCIAL TI | 09/27/2018 | COMPLETED |
09/27/2018 | POST 3RD PARTY REVIEW | 12/27/2018 | COMPLETED |
12/27/2018 | 3RD PARTY REVIEW - REVISION/OTHER | 01/04/2019 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T18CM06066
Permit Description: RAYHEON ETF
Total Completed Inspections - 32
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2019 | BUILDING PRE-SLAB | BSTEVENS | Approved | mechanical pad OK to pour. |
05/30/2019 | MECHANICAL - UNDERGROUND | MHASSAN | Approved | |
05/30/2019 | PLUMBING - PRE SLAB | MHASSAN | Approved | |
05/30/2019 | ELECTRIC - UNDERGROUND | MHASSAN | Approved | |
05/30/2019 | SHEET ROCK NAILING | MHASSAN | Approved | |
05/30/2019 | FRAMING | MHASSAN | Approved | |
05/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN | Approved | |
05/30/2019 | MECHANICAL - INTERMEDIATE | MHASSAN | Approved | |
05/30/2019 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | |
07/30/2019 | ELECTRIC - UFER | MHASSAN | Approved | |
08/16/2019 | MECHANICAL - ABOVE CEILING | MHASSAN | Approved | |
08/16/2019 | PLUMBING - ABOVE CEILING | MHASSAN | Approved | |
08/16/2019 | PLUMBING - ROUGH, SOIL | MHASSAN | Approved | this was under a different permit same job |
08/16/2019 | ELECTRIC - CABLE DROP | MHASSAN | Approved | |
08/16/2019 | ELECTRIC - ABOVE CEILING | MHASSAN | Approved | |
08/16/2019 | ELECTRIC - INTERMEDIATE | MHASSAN | Approved | |
08/16/2019 | BUILDING ABOVE CEILING | MHASSAN | Approved | |
08/16/2019 | STEM WALL/RETAINING WALL | MHASSAN | Approved | |
08/16/2019 | PLUMBING - FINAL | MHASSAN | Approved | |
08/21/2019 | MECHANICAL - FINAL | MHASSAN | Approved | pending test and balance report |
09/06/2019 | PLUMBING - GAS PRESS TEST FNL | TVALENCIA | Approved | APPROVED UPON 3090 APPROVAL |
09/06/2019 | PLUMBING - GAS PRESSURE TEST | BSTEVENS | Approved | (RVI) |
09/06/2019 | PLUMBING - GAS PRESS TEST FNL | TVALENCIA | Approved | 1- I could not locate bldg. 930 and there was no contact number or message given. Please reschedule and provide a contact number at the time of inspection request. |
09/06/2019 | PLUMBING - GAS PRESSURE TEST | TVALENCIA | Approved | 1- I could not locate bldg. 930 and there was no contact number or message given. Please reschedule and provide a contact number at the time of inspection request. |
10/24/2019 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
10/24/2019 | ELECTRIC - OUTDOOR LIGHTING | TVALENCIA | Approved | |
10/24/2019 | ELECTRIC - FINAL | TVALENCIA | Approved | 1- Recommended for Temp C of O. |
10/25/2019 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
10/30/2019 | BUILDING - FINAL | TVALENCIA | Approved | 1- Building Final is okay for C of O pending air balance report approval. |
12/05/2019 | ENGINEERING - FINAL | DROBERTS | Approved | PENDING ALL CLOSEOUT DOCUMENTS FOR THE DEVELOPMENT PACKAGE |
12/20/2019 | FIRE - FINAL | JPEELDAVIS | Approved | Still need Raytheon to perform the ERR test and provide us documentation and or install the system if failed. |
12/20/2019 | FIRE - ALARM FINAL | JPEELDAVIS | Approved |