Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
7302 E 19TH ST
Address NEW:
7302 E 19TH ST
Apply Date:
04/04/2018
Applicant:
Danny Quihuis
Description:
SFR REMODEL/ ADDITION

Permit Reviews

Permit Number - T18CM02491
Permit Status: Issued
Permit Description: SFR REMODEL/ ADDITION
Start Date Submittal Complete Date Status  
04/04/2018 RESIDENTIAL - BLDG/ZONING-WALKTHRU 04/04/2018 COMPLETED Review Details
04/09/2018 RESIDENTIAL - BLDG/WWM 05/04/2018 COMPLETED Review Details
05/04/2018 RESUBMITTAL 05/11/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM02491
Permit Status: Issued
Permit Description: SFR REMODEL/ ADDITION
Total Outstanding Activity Conditions - 1
Date Name
04/04/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Issued
Permit Number: T18CM02491
Permite Description: SFR REMODEL/ ADDITION
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/31/2019 COT - LCPL - Plumbing Above Ceiling N/A Canceled {Activity date: 01/31/2019; Status: Not Applicable; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
01/31/2019 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Canceled {Activity date: 01/31/2019; Status: Not Applicable; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
02/14/2019 COT - HCBU - Interior Shear Bracing N/A Canceled {Activity date: 02/14/2019; Status: Not Applicable; Inspector: BJONES; Comment: Entered by CBELL1 - Sheet rock nailing not required on this Structure} ; {Activity date: 01/31/2019; Status: Not Applicable; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 RSEL - Electrical Progress N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T18CM02491
Permit Description: SFR REMODEL/ ADDITION
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/29/2018 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/29/2018; Status: Approved; Inspector: DFLORES2; Comment: Entered by DFLORES2 - }
07/06/2018 COT - RSBU - Preslab Passed {Activity date: 07/06/2018; Status: Approved; Inspector: GWest; Comment: Entered by GWEST2 - } ; {Activity date: 07/03/2018; Status: Correction Required; Inspector: GWest; Comment: Entered by GWEST2 - }
07/06/2018 COT - RSPL - Rough Soil Passed {Activity date: 07/06/2018; Status: Approved; Inspector: GWest; Comment: Entered by GWEST2 - } ; {Activity date: 07/03/2018; Status: Correction Required; Inspector: GWest; Comment: Entered by GWEST2 - No PVC allowed under slab. 10' Head of water required for underground Building drain and branc lines test. Clean out required at 4" Building Drain Vent line, over 40' and 90 degree bends}
07/23/2018 COT - LCBU - Framing Passed {Activity date: 07/23/2018; Status: Approved; Inspector: BJONES; Comment: Entered by BJONES1 - 6 COURSES OF BLOCK-FIRST LIFT} ; {Activity date: 07/21/2018; Status: Approved; Inspector: BJONES1; Comment: Entered by BJONES1 - IVRS - Inspection :*}
08/19/2018 COT - RSEL - Temporary Service Passed {Activity date: 08/19/2018; Status: Approved; Inspector: BJONES1; Comment: Entered by BJONES1 - IVRS - Inspection :*} ; {Activity date: 08/14/2018; Status: Correction Required; Inspector: GWest; Comment: Entered by GWEST2 - 2 groundrods required a min of 6' apart. Label all breakers. No gas and Pex water pipe}
08/19/2018 COT - RSEL - Service Upgrade Passed {Activity date: 08/19/2018; Status: Approved; Inspector: BJONES1; Comment: Entered by BJONES1 - IVRS - Inspection :*}
08/20/2018 BULD - Electrical Clearance Passed {Activity date: 08/20/2018; Status: Approved; Inspector: BJONES; Comment: Entered by AMONTIJ2 - TMPP}
12/21/2018 COT - RSBU - Roof Nailing Passed {Activity date: 12/21/2018; Status: Approved; Inspector: BJONES; Comment: Entered by CBELL1 - }
01/31/2019 COT - LCPL - Plumbing Intermediate Passed {Activity date: 01/31/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
01/31/2019 COT - RSPL - Sewer Passed {Activity date: 01/31/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } ; {Activity date: 01/23/2019; Status: Correction Required; Inspector: BJONES; Comment: Entered by CBELL1 - No water test} ; {Activity date: 01/22/2019; Status: Not ready for Inspection; Inspector: GWEST; Comment: Entered by VFLORES1 - No test online yet}
01/31/2019 COT - RSBU - Sustainability Passed {Activity date: 01/31/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
05/20/2019 COT - RSEL - Outdoor Lighting Passed {Activity date: 05/20/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - }
05/20/2019 RSPL - Plumbing Progress Passed {Activity date: 05/20/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - }
05/20/2019 RSBU - Building Progress Passed {Activity date: 05/20/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/06/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - 1st lift approved by BJones. This was for second lift to top of perimeter walls-Approved-GWest 8-6-2018}
11/03/2020 COT - RSME - Mechanical Final Passed {Activity date: 11/03/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Approved} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - No address posted, garage outlets to be a minimum 18 inches above floor, smoke alarms are to be interlocked, T&P and condensate drain to be minimum 6 inches above grade, sewer cleanout to be flush with the grade}
11/03/2020 COT - RSPL - Yard Water Line Passed {Activity date: 11/03/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Approved} ; {Activity date: 05/20/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - yard line to be exposed for inspection..}
11/03/2020 COT - RSPL - Plumbing Final Passed {Activity date: 11/03/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Approved} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - No address posted, garage outlets to be a minimum 18 inches above floor, smoke alarms are to be interlocked, T&P and condensate drain to be minimum 6 inches above grade, sewer cleanout to be flush with the grade}
11/03/2020 COT - RSEL - Electrical Final Passed {Activity date: 11/03/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Approved} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - No address posted, garage outlets to be a minimum 18 inches above floor, smoke alarms are to be interlocked, T&P and condensate drain to be minimum 6 inches above grade, sewer cleanout to be flush with the grade.}
11/09/2020 RSBU - Building Final Passed {Activity date: 11/09/2020; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - CLEARED SPECIAL INSP ENTRIES AS NOT REQUIRED} ; {Activity date: 11/03/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - PENDING-SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - No address posted, garage outlets to be a minimum 18 inches above floor, smoke alarms are to be interlocked, T&P and condensate drain to be minimum 6 inches above grade, sewer cleanout to be flush with the grade.}

Documents

File Name Document Type  
001_C1.1.TIF CONSTRPLANS VIEW
002_A1.1.TIF CONSTRPLANS VIEW
003_A2.1.TIF CONSTRPLANS VIEW
004_A3.1.TIF CONSTRPLANS VIEW
005_S1.1.TIF CONSTRPLANS VIEW
006_S2.1.TIF CONSTRPLANS VIEW
007_M1.1.TIF CONSTRPLANS VIEW
008_P1.1.TIF CONSTRPLANS VIEW
009_E1.1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW