Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Address NEW:
1501 N CAMPBELL AV
Apply Date:
03/21/2018
Applicant:
DUSTIN DIAZ
Description:
PAVILLION IMPROVEMENT
Architects:
  • WATSON, ANGELA

Permit Reviews

Permit Number - T18CM02149
Permit Status: Final
Permit Description: PAVILLION IMPROVEMENT
Start Date Submittal Complete Date Status  
04/17/2018 COMMERCIAL - TI 05/31/2018 COMPLETED Review Details
06/04/2018 RESUBMITTAL - TI ALL 06/26/2018 COMPLETED Review Details
06/29/2018 RESUBMITTAL 06/29/2018 COMPLETED Review Details
07/24/2018 RESUBMITTAL 07/24/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM02149
Permit Status: Final
Permit Description: PAVILLION IMPROVEMENT
Total Outstanding Activity Conditions - 1
Date Name
03/21/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T18CM02149
Permit Description: PAVILLION IMPROVEMENT
Total Completed Inspections - 34
Date Description Inspector Results Comments
05/10/2018 MECHANICAL - FINAL RSHERRY Approved AIR BALANCE REPORT REQUIRED
07/24/2018 PLUMBING - FINAL RSHERRY Approved WATER CHLORINATION REPORT REQUIRED
07/26/2018 BUILDING ABOVE CEILING JBURGE Approved PHASE I COMPLETE - OK TO SET CEILING TILES.
07/26/2018 PLUMBING - ABOVE CEILING JBURGE Approved PHASE I COMPLETE.
09/04/2018 STEM WALL/RETAINING WALL JBURGE Approved CMU STEM WALL AT 12" - 48"; NORTH WEST CORNER OF BUILDING - OK TO GROUT PROGRESS AREAS.
09/05/2018 PLUMBING - PROGRESS JBURGE Approved PLUMBING ROUGH SOIL: 8' ROOF DRAIN PIPE/LINE. OK TO COVER.
09/10/2018 MECHANICAL - HYDRONIC PIPING JBURGE Approved DOMESTIC WATER LINE AT 2 1/2", HEATED HOT WATER SUPPLY AND RETURN AT 3"; CHILLED BEAM SUPPLY AND RETRUN LINES AT 3". OK TO COVER PROGRESS AREAS.
09/25/2018 ROOF NAILING JBURGE Approved METAL DECK SYSTEM; PUDDLE WELDED. OK TO COVER.
09/27/2018 BUILDING PRE-SLAB JBURGE Approved Main entry areas (North and Northeast), Rebar is in place. Ok to place concrete.
10/11/2018 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved West exterior wall - dens-glas system. Ok to water proof
11/28/2018 ELECTRIC - UNDERGROUND JBURGE Approved Conduits and users for 7 light pole caisson footings. Ok to cover progress areas.
11/28/2018 MECHANICAL - ABOVE CEILING JBURGE Approved High and low pressure duct system. Ok to insulate progress areas.
12/03/2018 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved 8 each light pole caisson footings at West portion of site. Ok to place concrete
12/05/2018 PLUMBING - ROOF DRAINS JBURGE Approved storm drains and over flow drains tested and corrections are complete.
12/17/2018 FRAMING JBURGE Approved West restroom ceiling. Soffits at main entry areas, center portion of building. Ok to cover progress areas.
12/19/2018 ELECTRIC - INTERMEDIATE JBURGE Approved Chapel area in wall electric. Ok to cover walls
12/19/2018 PLUMBING - INTERMEDIATE JBURGE Approved 4 each 4” roof drains at North entry area. Under Hydro test - ok to drain lines
12/26/2018 SHEET ROCK NAILING JBURGE Approved West shaft. Fire caulked and sheet rocked. Ok to place final layer of sheetrock.
12/26/2018 ELECTRIC - ABOVE CEILING JBURGE Approved 9 Can lights in soffits in main entry areas
12/28/2018 PLUMBING - ROUGH, SOIL JBURGE Approved EDMRE, Phase III - WASTE & Vent lines at 1 1/2" - 4" lines, Ok to cover
03/28/2019 FIRE - FINAL JPEELDAVIS Approved
04/05/2019 OUTDOOR LIGHTING FINAL JBURGE Approved
04/05/2019 ELECTRIC - FINAL JBURGE Approved
04/05/2019 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved
04/05/2019 ELECTRIC - PROGRESS JBURGE Approved
04/05/2019 ELECTRIC - CONSTRUCTION POWER JBURGE Approved
04/05/2019 ELECTRIC - TEMPORARY SERVICE JBURGE Approved
04/05/2019 ELECTRIC - UFER JBURGE Approved
04/05/2019 BUILDING - PROGRESS JBURGE Approved
04/05/2019 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved
04/05/2019 U VALUE FOR WINDOW JBURGE Approved
04/05/2019 REINFORCED MASONRY PRE-GROUT JBURGE Approved
04/05/2019 MECHANICAL - INTERMEDIATE JBURGE Approved
09/09/2019 BUILDING - FINAL JBURGE Approved PENDING ENGINEERING FINAL