Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/31/2017
Applicant:
BORDERLAND CONSTRUCTION COMPANY INC
Description:
INSTALLATION OF AN OFFSITE SEWER FOR VISTA DEL LAGO NORTH PHASE 3 AND THE TIE-IN POINT IS ON THE NORTH SIDE OF MARY ANN CLEVELAND WAY. THIS WILL REQUIRE A 24 HR TRAFFIC CONTROL WITH BOTH LANES REMAINING OPEN TO TRAFFIC DURING THE DAYTIME HOURS. TRENCH PATCHING AND SEWER WORK WILL BE INSTALLED DURING NIGHT HOURS. 6:00PM TO 6:00AM NOTE: THE ADDRESS ON THE PERMIT IS FOR PERMITTING PURPOSES ONLY - THIS IS THE CLOSEST ADDRESS TO THE WORK

Completed Inspections

Permit Status: Final
Permit Number: T17RW03903
Permit Description: INSTALLATION OF AN OFFSITE SEWER FOR VISTA DEL LAGO NORTH PHASE 3 AND THE TIE-IN POINT IS ON THE NORTH SIDE OF MARY ANN CLEVELAND WAY. THIS WILL REQUIRE A 24 HR TRAFFIC CONTROL WITH BOTH LANES REMAINING OPEN TO TRAFFIC DURING THE DAYTIME HOURS. TRENCH PATCHING AND SEWER WORK WILL BE INSTALLED DURING NIGHT HOURS. 6:00PM TO 6:00AM NOTE: THE ADDRESS ON THE PERMIT IS FOR PERMITTING PURPOSES ONLY - THIS IS THE CLOSEST ADDRESS TO THE WORK
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/26/2017 TDOT-EXCAV GENERAL INSPECTION BMONG Approved

Documents

File Name Document Type  
T17RW03903.PDF ROW-RIGHT OF WAY VIEW