Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | ||
| 09/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | DIRT HAUL FLAGGERS ON SITE | |
| 09/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | PAVING ON MARY ANN CLEVELAND 2 LIFTS | |
| 09/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 302AM TO 6AM SLURRY SEWER PIPE TRAFFIC CONTROL REMOVED 530AM |
|
| 09/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 310AM TO 6AM SLURRY SEWER PIPE HAVE NOT REDUCED SPEED YET |
|
| 09/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 646PM TO 850PM REDUCED SPEED UP WAITED AT ATTERBURY WASH 13 MINS |
|
| 09/18/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | WORKED 705PM TO 1010PM CROSSING MARY ANN CLEVELAND TRAFFIC CONTROL NEEDS SPEED REDUCTION |
|
| 09/07/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | inspected area and work has begun. work is not crossing mary ann clevelend yet. |