Permit: T17CM08994
Permit Details
Apply Date:
12/06/2017
Applicant:
Description:
E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Permit Reviews
Permit Number - T17CM08994
Permit Status: Expired
Permit Description: E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/04/2019 | REVISION - - 1ST | 02/21/2019 | COMPLETED |
11/27/2018 | REVISION - - 1ST | 02/04/2019 | COMPLETED |
12/06/2017 | PLANS OK TO SUBMIT - COMM | 12/06/2017 | COMPLETED |
12/22/2017 | COMMERCIAL - NEW | 11/27/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM08994
Permit Status: Expired
Permit Description: E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/06/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T17CM08994
Permit Status: Expired
Permit Description: E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Date | Description | Comments |
---|---|---|
12/22/2017 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
12/22/2017 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
12/22/2017 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T17CM08994
Permite Description: E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2022 | TRSP - ROW - Final/Close-Out | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T17CM08994
Permit Description: E- PARKING STRUCTURE FOR CATERPILLAR SM&T HQ
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/28/2018 | COT - LCPL - Rough Soil | Passed | {Activity date: 12/28/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } | |
03/01/2019 | COT - LCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 01/10/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - completion of crash walls per detail 211/S 4.1 completion of column tops for future solar } ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Crush wall per detail 211/S 4.1 GL M from 2-4 & GL 1 from J-L Column tops for future solar Gridline 3 from J to M} ; {Activity date: 01/03/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Level 1 garage crash wall per detail 211. GL 6 from G-M & GL M from 4-6. Level 1 column tops for future solar GL 4 from G-M} |
|
03/01/2019 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 02/13/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - All panels and transformer OK to energize for test only} ; {Activity date: 12/18/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Level 1 garage slab GL 1-6 from H-M} | |
03/01/2019 | COT - LCEL - Electrical Underground | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/18/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Level 1 garage slab GL 1-6 from H-M} | |
03/01/2019 | COT - LCPL - Plumbing Roof Drains | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } | |
03/01/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } | |
03/01/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - except fitness center} | |
03/01/2019 | COT - LCEL - Electrical Final | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } | |
03/01/2019 | PDSD Building Division - Sign Final | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } | |
03/01/2019 | COT - LCBU - Building Progress | Passed | {Activity date: 03/01/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 11/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - 2nd floor column tops for future solar grid line 1 to 6 from a to D only} | |
04/12/2019 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by AVAUGHN1 - PER 1090} ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - level 2 Gridline 2-5 from A-C except room 2030} | |
04/12/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - Note landscaping depressed areas will be re-inspected under the DP permit and requires 6 inches of clear space below curb openings} ; {Activity date: 03/01/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Complete all work on approved plans.} | |
04/12/2019 | COT - LCBU - Building Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Except stairs and guard rails Pending fire and engineering finals} |
|
04/12/2019 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Except north stairwell footers} ; {Activity date: 02/25/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - work not complete} ; {Activity date: 02/22/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by CBELL1 - East side of garage bridge expansion joint OK to pour.} ; {Activity date: 02/06/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by CBELL1 - Contractor cancelled the inspection request} ; {Activity date: 02/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Northbridge ramp only} ; {Activity date: 01/16/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Stairwell to parking lot canopy} ; {Activity date: 01/07/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - garage bridges north and west see RFI 368} | |
04/12/2019 | COT - LCEL - Outdoor Lighting | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Pending any special inspections} | |
04/12/2019 | COT - LCBU - Preslab | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 03/28/2019; Status: Partial Approval; Inspector: BSTEVENS; Comment: Entered by CBELL1 - OK to pour garage stairs} ; {Activity date: 02/25/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - work not complete} ; {Activity date: 02/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Northbridge ramp only} ; {Activity date: 01/16/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Stairwell to parking lot canopy} ; {Activity date: 01/07/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - garage bridges north and west see RFI 368} ; {Activity date: 12/18/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Level 1 garage slab GL 1-6 from H-M} ; {Activity date: 12/14/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - See permit T17cm08953 Entire bottom level GL 1-6 from A-M Level 1 GL 1-6 from A-H Garage parapet GL1 from B to E Garage parapet GL 6 from D to F Level 1 2nd floor column tops for future solar GL E-G from 1 to 6} ; {Activity date: 11/30/2018; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by CBELL1 - N.W. corner of 1st pour, parapet wall C.L. C to B and 20 foot south ok} |
|
04/12/2019 | ENGR Engineering Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - Note landscaping depressed areas will be re-inspected under the DP permit and requires 6 inches of clear space below curb openings} ; {Activity date: 03/01/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - walked site with GC went over work to complete.} | |
04/12/2019 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by AVAUGHN1 - PER 3037} ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - level 2 Gridline 2-5 from A-C except room 2030} | |
04/12/2019 | COT - FCON - Fire - Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: jvincent; Comment: Entered by JVINCEN1 - will add extinguisher signs to posts/wall. extinguishers will be obstructed by parked vehicles.} ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: jvincent; Comment: Entered by MROSS2 - Approved to obtain TCO. Ok to occupy/park on lower level. Install extinguisher cabinets and extinguishers. Garage not sprinklered or alarmed.} | |
04/12/2019 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by AVAUGHN1 - PER 2090} ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - level 2 Gridline 2-5 from A-C except room 2030} | |
04/12/2019 | COT - LCPL - Plumbing Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Insulate exposed copper at hose bib} | |
04/16/2019 | COT - LCBU - Framing | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by AVAUGHN1 - PER 1090} ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } | |
04/16/2019 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by AVAUGHN1 - } ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - level 2 Gridline 2-5 from A-C except room 2030} | |
04/16/2019 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by AVAUGHN1 - PER 1090} ; {Activity date: 04/12/2019; Status: Not Applicable; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } | |
04/16/2019 | COT - LCBU - Roof Nailing | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by AVAUGHN1 - PER 1090} ; {Activity date: 03/01/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } |