Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
11/13/2017
Applicant:
D R H TUCSON CONSTRUCTION
Description:
SFR DRH4550 T16-MOO64
Contractors:
  • D R H TUCSON CONSTRUCTION

Permit Reviews

Permit Number - T17CM08465
Permit Status: Final
Permit Description: SFR DRH4550 T16-MOO64
Start Date Submittal Complete Date Status  
11/13/2017 RESIDENTIAL - BLDG/ZONING-WALKTHRU 11/13/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T17CM08465
Permit Description: SFR DRH4550 T16-MOO64
Total Completed Inspections - 25
Date Description Inspector Results Comments
12/07/2017 PLUMBING - SEWER HCS CONNECT bbenedo1 Approved
12/07/2017 PLUMBING - YARD WTR LINE/TEST bbenedo1 Approved
12/07/2017 PLUMBING - ROUGH, SOIL bbenedo1 Approved
12/07/2017 ELECTRIC - UNDERGROUND BBENEDO1 Approved IVRS - Inspection :*
12/07/2017 ELECTRIC - UFER BBENEDO1 Approved IVRS - Inspection :*
12/07/2017 BUILDING PRE-SLAB BBENEDO1 Approved IVRS - Inspection :*
12/07/2017 EXCAVATION/LAYOUT REBAR & ZON BBENEDO1 Approved IVRS - Inspection :*
12/26/2017 ELECTRIC - CONSTRUCTION POWER BBENEDO1 Approved IVRS - Inspection :*
12/26/2017 ELECTRIC - CABLE DROP BBENEDO1 Approved IVRS - Inspection :*
12/26/2017 ROOF NAILING BBENEDO1 Approved IVRS - Inspection :*
12/26/2017 EXT METAL CLIPS/EXT SHEATHING BBENEDO1 Approved IVRS - Inspection :*
01/12/2018 U VALUE FOR WINDOW DQUINN Approved
01/16/2018 TEP CLEARANCE - AM QUINN Approved ECO
02/09/2018 PLUMBING - INTERMEDIATE DF Approved NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC
02/09/2018 MECHANICAL - INTERMEDIATE DF Approved NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC
02/09/2018 ELECTRIC - INTERMEDIATE DF Approved NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC
02/09/2018 STUCCO MESH DF Approved NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC
02/09/2018 FRAMING DF Approved NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC
02/23/2018 SHEET ROCK NAILING DFLORES2 Approved
03/27/2018 MECHANICAL - FINAL MHASSAN1 Approved
03/27/2018 PLUMBING - FINAL MHASSAN1 Approved STRAP DISHWASHER DRAIN HOSE AT SINK LEVEL OR ABOVE
03/27/2018 PLUMBING - PROGRESS MHASSAN1 Approved N/A AT THIS TIME
03/27/2018 OUTDOOR LIGHTING FINAL MHASSAN1 Approved
03/27/2018 ELECTRIC - FINAL MHASSAN1 Approved
03/27/2018 BUILDING - FINAL MHASSAN1 Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW