Permit: T17CM08465
Permit Details
Apply Date:
11/13/2017
Applicant:
D R H TUCSON CONSTRUCTION
Description:
SFR DRH4550 T16-MOO64
Contractors:
- D R H TUCSON CONSTRUCTION
Permit Reviews
Permit Number - T17CM08465
Permit Status: Final
Permit Description: SFR DRH4550 T16-MOO64
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/13/2017 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 11/13/2017 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T17CM08465
Permit Description: SFR DRH4550 T16-MOO64
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/07/2017 | PLUMBING - SEWER HCS CONNECT | bbenedo1 | Approved | |
12/07/2017 | PLUMBING - YARD WTR LINE/TEST | bbenedo1 | Approved | |
12/07/2017 | PLUMBING - ROUGH, SOIL | bbenedo1 | Approved | |
12/07/2017 | ELECTRIC - UNDERGROUND | BBENEDO1 | Approved | IVRS - Inspection :* |
12/07/2017 | ELECTRIC - UFER | BBENEDO1 | Approved | IVRS - Inspection :* |
12/07/2017 | BUILDING PRE-SLAB | BBENEDO1 | Approved | IVRS - Inspection :* |
12/07/2017 | EXCAVATION/LAYOUT REBAR & ZON | BBENEDO1 | Approved | IVRS - Inspection :* |
12/26/2017 | ELECTRIC - CONSTRUCTION POWER | BBENEDO1 | Approved | IVRS - Inspection :* |
12/26/2017 | ELECTRIC - CABLE DROP | BBENEDO1 | Approved | IVRS - Inspection :* |
12/26/2017 | ROOF NAILING | BBENEDO1 | Approved | IVRS - Inspection :* |
12/26/2017 | EXT METAL CLIPS/EXT SHEATHING | BBENEDO1 | Approved | IVRS - Inspection :* |
01/12/2018 | U VALUE FOR WINDOW | DQUINN | Approved | |
01/16/2018 | TEP CLEARANCE - AM | QUINN | Approved | ECO |
02/09/2018 | PLUMBING - INTERMEDIATE | DF | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC |
02/09/2018 | MECHANICAL - INTERMEDIATE | DF | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC |
02/09/2018 | ELECTRIC - INTERMEDIATE | DF | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC |
02/09/2018 | STUCCO MESH | DF | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC |
02/09/2018 | FRAMING | DF | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC |
02/23/2018 | SHEET ROCK NAILING | DFLORES2 | Approved | |
03/27/2018 | MECHANICAL - FINAL | MHASSAN1 | Approved | |
03/27/2018 | PLUMBING - FINAL | MHASSAN1 | Approved | STRAP DISHWASHER DRAIN HOSE AT SINK LEVEL OR ABOVE |
03/27/2018 | PLUMBING - PROGRESS | MHASSAN1 | Approved | N/A AT THIS TIME |
03/27/2018 | OUTDOOR LIGHTING FINAL | MHASSAN1 | Approved | |
03/27/2018 | ELECTRIC - FINAL | MHASSAN1 | Approved | |
03/27/2018 | BUILDING - FINAL | MHASSAN1 | Approved |