Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2018 | PLUMBING - INTERMEDIATE | Approved | NO RFI FROM ENGINEER NEEDED AT THIS POINT BECAUSE FRAME WAS RE-BUILT ACCORDING TO SPEC | |
| 02/06/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ||
| 01/12/2018 | PLUMBING - INTERMEDIATE | Denied | 1. NEED DWV TEST AND WATER PRESSURE. 2. FHA STRAP 2" AND 3" ABS AT TOP PLATE OVER-BORES |