Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address NEW:
2820 N CASTRO AV 02
Apply Date:
10/06/2017
Applicant:
CARHUFF, PHILIP ANDREW
Description:
NEW APARTMENT BUILDING 12 UNITS
Architects:
  • CARHUFF, PHILIP ANDREW
Contractors:
  • CANYON BUILDING AND DESIGN LLC *APA*

Permit Reviews

Permit Number - T17CM07585
Permit Status: C of o
Permit Description: NEW APARTMENT BUILDING 12 UNITS
Start Date Submittal Complete Date Status  
05/23/2018 REVISION - - 1ST 05/24/2018 COMPLETED Review Details
07/06/2018 REVISION - - 2ND 07/06/2018 COMPLETED Review Details
07/24/2018 REVISION - - 3RD 07/24/2018 COMPLETED Review Details
10/06/2017 PLANS OK TO SUBMIT - COMM 10/06/2017 COMPLETED Review Details
10/12/2017 COMMERCIAL - NEW 11/15/2017 COMPLETED Review Details
11/15/2017 RESUBMITTAL 12/13/2017 COMPLETED Review Details
12/13/2017 RESUBMITTAL 05/04/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM07585
Permit Status: C of o
Permit Description: NEW APARTMENT BUILDING 12 UNITS
Total Outstanding Activity Conditions - 1
Date Name
10/06/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM07585
Permit Description: NEW APARTMENT BUILDING 12 UNITS
Total Completed Inspections - 43
Date Description Inspector Results Comments
10/27/2017 FIRE SPKLR - FINAL RHERNANDEZ Approved P2I MAY BE DELETED WHEN THE ROOF AND FLOOR TRUSS DESIGN CALCULATIONS AND DRAWINGS HAVE BEEN REVIEWED AND APPROVED.
12/11/2017 MECHANICAL - FINAL RSHERRY Approved AIR BALANCE REPORT REQUIRED
12/13/2017 PLUMBING - FINAL RSHERRY Approved WATER CHLORINATION REPORT REQUIRED
07/25/2018 ELECTRIC - TEMPORARY SERVICE ESTEVEN1 Approved APPROVED TMPP
07/26/2018 TEP CLEARANCE - AM ESTEVENS Approved TMPP
08/02/2018 PLUMBING - ROUGH, SOIL ESTEVEN1 Approved SUBMIT 2ND PARTIAL ISOMETEIC PLAN,
OK TO BACK FILL
08/09/2018 ELECTRIC - UNDERGROUND MHASSAN1 Approved APPROVED WITHIN FOOTPRINT OF THE RESIDENTIAL BUILDING.
08/09/2018 EXCAVATION/LAYOUT REBAR & ZON MHASSAN1 Approved FINISH CLEANING OUT FOOTINGS FROM OVERNIGHT RAIN AND INSTALL BLOCKOUTS
08/15/2018 STEM WALL/RETAINING WALL ESTEVEN1 Approved INTERIOR STEM WALLS
08/23/2018 BUILDING PRE-SLAB JBURGE1 Approved IVRS - Inspection :*
09/20/2018 BUILDING - PROGRESS DFLORES Approved THIS INSPECTION WAS FOR COULMN BASES ALL ALONG THE SOUTH SIDE OF JOB SITE, NEED TO MAKE SURE RE BAR IS 3" AWAY FROM SOIL ON ALL SIDES
10/04/2018 PLUMBING - SEWER HCS CONNECT MHASSAN Approved
10/25/2018 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved 2 inch line to one and a half line to all units
11/28/2018 PLUMBING - PROGRESS ESTEVENS Approved Not under test
11/28/2018 ELECTRIC - ABOVE CEILING ESTEVENS Approved Above hard lid area.
12/12/2018 MECHANICAL - INTERMEDIATE JBURGE Approved units #2105-2108.
12/12/2018 PLUMBING - INTERMEDIATE JBURGE Approved units #2105-2108.
12/12/2018 ELECTRIC - INTERMEDIATE JBURGE Approved units 2105-2108
12/12/2018 BUILDING ABOVE CEILING JBURGE Approved units #2105-2108.
12/12/2018 FRAMING JBURGE Approved Building #2; units #2105-2108. Ok to insulate and sheetrock.
12/19/2018 SHEET ROCK NAILING TVALENCIA Approved
12/19/2018 U VALUE FOR WINDOW TVALENCIA Approved
12/19/2018 STUCCO MESH TVALENCIA Approved
12/19/2018 ROOF NAILING TVALENCIA Approved
12/19/2018 EXT METAL CLIPS/EXT SHEATHING TVALENCIA Approved
01/29/2019 ELECTRIC - SERVICE UPGRADE JBURGE Approved Called in for clearance at 1420 hours
01/29/2019 ELECTRIC - UFER JBURGE Approved
04/19/2019 OUTDOOR LIGHTING FINAL JBURGE Approved
04/19/2019 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved
04/19/2019 ELECTRIC - PROGRESS JBURGE Approved
04/29/2019 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved
04/29/2019 ELECTRIC - TEMPORARY POLE ESTEVENS Approved
04/29/2019 MECHANICAL - PROGRESS ESTEVENS Approved
04/30/2019 ELECTRIC - FINAL TVALENCIA Approved
10/14/2019 ENGINEERING - FINAL BBENEDON Approved
10/15/2019 CERTIFICATE OF OCCUPANCY DROBERTS Approved
10/15/2019 BUILDING - FINAL DROBERTS Approved
10/15/2019 ZONING - FINAL ACONNOR Approved RECORDED EASEMENT SEQ # 20191510634
10/15/2019 ZONING - FINAL DROBERTS Approved FINAL CAN BE GIVEN UNDER MY NAME ONCE THE EASMENT IN QUESTION HAS BEEN DETERTMINED AND APPROVED BY THE ZONING REVIEWER.
10/15/2019 BUILDING - FINAL DROBERTS Approved FINAL CAN BE GIVEN UNDER MY NAME ONCE THE EASMENT IN QUESTION HAS BEEN DETERTMINED AND APPROVED BY THE ZONING REVIEWER.
10/15/2019 CERTIFICATE OF OCCUPANCY DROBERTS Approved FINAL CAN BE GIVEN UNDER MY NAME ONCE THE EASMENT IN QUESTION HAS BEEN DETERTMINED AND APPROVED BY THE ZONING REVIEWER.
10/15/2019 FIRE - FINAL JPEELDAVIS Approved approved by Chris Basaldua on 04-29-2019
10/15/2019 FIRE - ALARM FINAL JPEELDAVIS Approved Fire sprinkler was approved by Chris Basaldua on permit T18FC00992 on 04-29-2019

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_T1.0.TIF CONSTRPLANS VIEW
001_A2.1.TIF.TIF CONSTRPLANS VIEW
002_A5.1.TIF.TIF CONSTRPLANS VIEW
None CONSTRPLANS VIEW
None DOCUMENTS VIEW
GEOTECH ENGINEERING EVALUATION.PDF DOCUMENTS VIEW
CALCS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
T17CM07585 ENERGY CODE TESTING.PDF DOCUMENTS VIEW
T17CM07585 AIR BALANCE.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW