Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Apply Date:
09/28/2017
Applicant:
A23 STUDIOS
Description:
OFFICE
Architects:
  • A23 STUDIOS

Permit Reviews

Permit Number - T17CM07418
Permit Status: C of o
Permit Description: OFFICE
Start Date Submittal Complete Date Status  
09/28/2017 COMMERCIAL - TI 10/06/2017 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM07418
Permit Status: C of o
Permit Description: OFFICE
Total Outstanding Activity Conditions - 1
Date Name
09/28/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM07418
Permit Description: OFFICE
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/22/2017 PLUMBING - ROUGH, SOIL RGREENE Approved
12/08/2017 PLUMBING - INTERMEDIATE TVALENC1 Approved IVRS - Inspection :*
12/08/2017 ELECTRIC - INTERMEDIATE TVALENC1 Approved IVRS - Inspection :*
12/18/2017 BUILDING ABOVE CEILING aquiroz Approved
12/18/2017 MECHANICAL - ABOVE CEILING aquiroz Approved
12/18/2017 PLUMBING - ABOVE CEILING aquiroz Approved
12/18/2017 ELECTRIC - ABOVE CEILING aquiroz Approved
12/29/2017 PLUMBING - PROGRESS rbaldwin Approved
12/29/2017 MECHANICAL - INTERMEDIATE rbaldwin Approved
12/29/2017 SHEET ROCK NAILING rbaldwin Approved
12/29/2017 FRAMING rbaldwin Approved
12/29/2017 BUILDING - PROGRESS rbaldwin Approved
12/29/2017 CERTIFICATE OF OCCUPANCY rbaldwin Approved
12/29/2017 BUILDING - FINAL rbaldwin Approved
12/29/2017 MECHANICAL - FINAL rbaldwin Approved
12/29/2017 PLUMBING - FINAL rbaldwin Approved
12/29/2017 ELECTRIC - FINAL rbaldwin Approved
12/29/2017 FIRE SPKLR - FINAL rbaldwin Approved
12/29/2017 ENGINEERING - FINAL RLEDONNE Approved
12/29/2017 FIRE - FINAL jvincent Approved 1) Mount 12" address numbers.
2) Replace two painted sprinkler heads (reception and staff restroom)
3) Need schedules for electrical panels or label each breaker.
4) Mount extinguisher in front reception area.
5) Fire alarm in "trouble." Needs service.
6) New control valve not wired. Not currently monitored. Needs to be wired and monitored. We need to verify signal once connected.
7) Need annual inspection report for sprinkler monitoring panel/alrarm/system. No tag on panel. Unknown when it was serviced last. Any deficiency on report needs to be resolved.
8) Waiting on copy of UL cert for monitoring company which is Avantguard monitoring.

Approved to obtain TCO for full occupancy.
12/29/2017 FIRE SPKLR - FINAL jvincent Approved -replace two painted heads (reception and staff restroom)

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_A1.0.TIF CONSTRPLANS VIEW
002_A2.0.TIF CONSTRPLANS VIEW
003_A3.0.TIF CONSTRPLANS VIEW
004_A4.0.TIF CONSTRPLANS VIEW
005_A5.0.TIF CONSTRPLANS VIEW
006_A5.1.TIF CONSTRPLANS VIEW
007_M1.0.TIF CONSTRPLANS VIEW
008_M2.0.TIF CONSTRPLANS VIEW
009_P1.0.TIF CONSTRPLANS VIEW
010_P2.0.TIF CONSTRPLANS VIEW
011_E0.1.TIF CONSTRPLANS VIEW
012_E2.1.TIF CONSTRPLANS VIEW
013_E3.1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW