Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
541 W CALLE MARGARITA
Apply Date:
05/18/2017
Applicant:
Fernando Hinojosa
Description:
LIVING ROOM ADDITIONA DDO approval is required for height change prior to completion

Outstanding Activity Conditions

Permit Number - T17CM03967
Permit Status: Issued
Permit Description: LIVING ROOM ADDITIONA DDO approval is required for height change prior to completion
Total Outstanding Activity Conditions - 2
Date Name
05/18/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/10/2017 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Issued
Permit Number: T17CM03967
Permite Description: LIVING ROOM ADDITIONA DDO approval is required for height change prior to completion
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - RSME - Mechanical Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSBU - Sustainability N/A Canceled Inspection Canceled
11/07/2022 COT - LCPL - Plumbing Intermediate N/A Canceled Inspection Canceled
11/07/2022 RSME - Mechanical Progress N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Issued
Permit Number: T17CM03967
Permit Description: LIVING ROOM ADDITIONA DDO approval is required for height change prior to completion
Total Completed Inspections - 10
Date Description Inspector Results Comments
01/31/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 01/31/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - }
04/17/2019 COT - RSEL - Service Relocation Passed {Activity date: 04/17/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CMURPHY1 - INC}
04/17/2019 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/17/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CMURPHY1 - CODE INCR}
05/09/2019 COT - RSBU - Preslab Passed {Activity date: 05/09/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by VFLORES1 - }
06/08/2020 COT - RSBU - Roof Nailing Passed {Activity date: 06/08/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/04/2020; Status: Cancelled; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - 1- Permit holder decided that he was going to reschedule when intermediates are complete.

} ; {Activity date: 07/16/2019; Status: Prior to Intermediates; Inspector: ARUIZ; Comment: Entered by ARUIZ1 - DDO approval submitted for height change. A DDO process and approval will need to take place prior to continuing.
Height change has changed set backs.} ; {Activity date: 05/09/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by VFLORES1 - elevation of the house is not per drawing, has been built more than 3 feet taller than drawing. 4 x 12 beam and 4 x 6 posts between family room and game room not per drawing, current beam does not span all the way across. These changes will need a revision and possibly engineering. Scuppers and crickets on the roof need to be per drawing. One is currently cut out over the electrical panel. Either build per drawings or revise. These corrections were explained to the gentleman on site in Spanish}
08/26/2020 COT - LCBU - Framing Passed {Activity date: 08/26/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Partial, all intermediates to be complete prior to approval.} ; {Activity date: 06/04/2020; Status: Cancelled; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - 1- Permit holder decided that he was going to reschedule when intermediates are complete.

} ; {Activity date: 05/09/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by VFLORES1 - call this in with completion of intermediate inspections}
08/26/2020 RSEL - Electrical Progress Passed {Activity date: 08/26/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Partial, Install Pre wired smoke detector.}
02/04/2021 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 02/04/2021; Status: Approved; Inspector: KCOCO; Comment: Entered by VLEON1 - APPROVED}
02/21/2023 RSBU - Building Final Passed
02/21/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
001_A1.0.TIF CONSTRPLANS VIEW
002_A2.0.TIF CONSTRPLANS VIEW
003_A3.0.TIF CONSTRPLANS VIEW
004_A4.0.TIF CONSTRPLANS VIEW
005_A5.0.TIF CONSTRPLANS VIEW
006_A6.0.TIF CONSTRPLANS VIEW
007_A7.0.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW