Inspection Status: Passed
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 06/08/2020 |
COT - RSBU - Roof Nailing |
TVALENCIA |
Approved |
Entered by RSALDAT1 - |
| 06/04/2020 |
COT - RSBU - Roof Nailing |
TVALENCIA |
Cancelled |
Entered by RSALDAT1 - 1- Permit holder decided that he was going to reschedule when intermediates are complete.
|
| 07/16/2019 |
COT - RSBU - Roof Nailing |
ARUIZ |
Prior to Intermediates |
Entered by ARUIZ1 - DDO approval submitted for height change. A DDO process and approval will need to take place prior to continuing.
Height change has changed set backs. |
| 05/09/2019 |
COT - RSBU - Roof Nailing |
MHASSAN |
Not ready for Inspection |
Entered by VFLORES1 - elevation of the house is not per drawing, has been built more than 3 feet taller than drawing. 4 x 12 beam and 4 x 6 posts between family room and game room not per drawing, current beam does not span all the way across. These changes will need a revision and possibly engineering. Scuppers and crickets on the roof need to be per drawing. One is currently cut out over the electrical panel. Either build per drawings or revise. These corrections were explained to the gentleman on site in Spanish |