Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2712 W MONTE VISTA PL
Apply Date:
04/13/2017
Applicant:
Dan Martin
Description:
SFR

Permit Reviews

Permit Number - T17CM02882
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
04/13/2017 PLANS OK TO SUBMIT - RES 04/14/2017 COMPLETED Review Details
04/14/2017 RESIDENTIAL - BLDG/ZONING/ENGINE/WWM 05/12/2017 COMPLETED Review Details
05/15/2017 RESUBMITTAL 05/15/2017 COMPLETED Review Details
05/15/2017 RESUBMITTAL 05/23/2017 COMPLETED Review Details
09/11/2018 REVISION - - 1ST 09/11/2018 COMPLETED Review Details
04/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/17/2024 APPROVED Review Details

Conditions

Permit Number - T17CM02882
Permit Status: Complete
Permit Description: SFR
Date Description Comments
04/13/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/14/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: T17CM02882
Permite Description: SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final N/A Not Ready
04/03/2023 COT - RSEL - Electrical Final N/A Canceled Canceled per home owner. 4/3/2023

Completed Inspections

Permit Status: Complete
Permit Number: T17CM02882
Permit Description: SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
08/10/2017 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 08/10/2017; Status: Approved; Inspector: JBURGE; Comment: Entered by JBURGE1 - } ; {Activity date: 08/02/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - GROUT SOLID STEM WALLS: #5 REBAR/BOLTS, "J" BOLTS AT 48" O.C.}
08/10/2017 COT - RSBU - Masonry Pregrout Passed {Activity date: 08/10/2017; Status: Approved; Inspector: JBURGE; Comment: Entered by JBURGE1 - } ; {Activity date: 08/02/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - TYPICAL WALLS AT 32" - 48"; #4 REBAR AT 16" O.C.. OK TO GROUT PROGRESS AREAS.}
09/07/2018 COT - RSBU - Sustainability Passed {Activity date: 09/07/2018; Status: Approved; Inspector: ESTEVENS; Comment: Entered by CMURPHY1 - }
01/11/2019 COT - RSPL - Gas Pressure Test Passed {Activity date: 01/11/2019; Status: Approved; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - 15 psi for 10 minutes
}
01/18/2019 COT - RSPL - Rough Soil Passed {Activity date: 01/18/2019; Status: Approved; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - No leaks observed
Green tracer wire from back of house towards HCS, underground plumbing in front is under slab in the garage future} ; {Activity date: 01/11/2019; Status: Denied; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - water leaking at elbow closest to street. AND no green tracer wire over 4 inch sewer pipe in yard.}
05/17/2019 COT - RSBU - Preslab Passed {Activity date: 05/17/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 05/14/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall complete forms for footing and slab.
2- Reference footing detail 1 S-1 showing the top rebar.
3- Shall wrap plumbing risers and any plumbing in concrete.
4- 20 feet of copper Ufer has been provided.}
02/03/2020 COT - RSEL - Grounding/Bonding Passed {Activity date: 02/03/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade.
Reference Table E3803.1 2012 IRC} ; {Activity date: 05/17/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- 20 feet of copper #4 Ufer conductor provided in footing.} ; {Activity date: 05/14/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall complete forms for footing and slab.
2- Reference footing detail 1 S-1 showing the top rebar.
3- Shall wrap plumbing risers and any plumbing in concrete.
4- 20 feet of copper Ufer has been provided.}
01/05/2021 COT - RSBU - Roof Nailing Passed {Activity date: 01/05/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 07/13/2020; Status: Denied; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Denied. No contact number or name in Messages, no contractor listed. Please call your inspector for further information.} ; {Activity date: 05/16/2018; Status: Partial Approval; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*}
01/05/2021 COT - LCBU - Framing Passed {Activity date: 01/05/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 07/13/2020; Status: Denied; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Denied. No contact number or name in Messages, no contractor listed. Please call your inspector for further information.} ; {Activity date: 09/07/2018; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by CMURPHY1 - submit revised plans to the city.
} ; {Activity date: 02/05/2018; Status: Partial Approval; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - 1. PROVIDE APPROVED ENGINEERING FOR CHANGE IN ROOF FRAMING.
2. GENERAL FRAMING LOOK GOOD, RE-CALL WHEN WALL BRACING IS COMPLETED.}
02/09/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 02/09/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - }
02/09/2021 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 02/09/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - }
02/18/2021 COT - BULD - SWG Clearance Passed {Activity date: 02/18/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - }
11/12/2021 COT - RSME - Mechanical Final Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap

Close permit}
11/12/2021 RSME - Mechanical Progress Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
05/10/2022 COT - RSPL - Yard Water Line Passed {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/10/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade.
Reference Table E3803.1 2012 IRC}
05/10/2022 COT - RSPL - Sewer Passed {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/10/2022 COT - RSEL - Construction Power Passed {Activity date: 05/10/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable.} ; {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/10/2022 RSEL - Electrical Progress Passed {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 02/03/2020; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Leave message with contact phone # for inspectors questions.
} ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade.
Reference Table E3803.1 2012 IRC}
05/10/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/17/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Steel reinforcement provided for the garage slab.} ; {Activity date: 08/08/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - COLUMN FOOTING #7; ENSURE DOUBLE #3 TIES AT THE TOP AND #3 RINGS AT 12" APART - DETAIL #2, PAGE S1.0. OK TO PLACE CONCRETE.} ; {Activity date: 07/24/2017; Status: Partial Approval; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - OK TO POUR, EXCEPT F7 POST FOOTING} ; {Activity date: 07/19/2017; Status: Denied; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - REBAR ISCORRECT, NEEDS TO BE 3" FROM THE EARTH} ; {Activity date: 07/17/2017; Status: Cancelled; Inspector: NORTH; Comment: Entered by BNORTH1 - }
09/18/2023 COT - RSPL - Plumbing Final Passed
03/13/2024 RSBU - Building Final Passed
03/13/2024 COT - RSEL - Electrical Final Passed