Permit: T17CM02882
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2712 W MONTE VISTA PL
Address NEW:
2712 W MONTE VISTA PL
Apply Date:
04/13/2017
Applicant:
Dan Martin
Description:
SFR
Permit Reviews
Permit Number - T17CM02882
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2017 | PLANS OK TO SUBMIT - RES | 04/14/2017 | COMPLETED |
| 04/14/2017 | RESIDENTIAL - BLDG/ZONING/ENGINE/WWM | 05/12/2017 | COMPLETED |
| 05/15/2017 | RESUBMITTAL | 05/15/2017 | COMPLETED |
| 05/15/2017 | RESUBMITTAL | 05/23/2017 | COMPLETED |
| 09/11/2018 | REVISION - - 1ST | 09/11/2018 | COMPLETED |
| 04/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/17/2024 | APPROVED |
Conditions
Permit Number - T17CM02882
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 04/13/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 03/14/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 03/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T17CM02882
Permite Description: SFR
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 04/03/2023 | COT - RSEL - Electrical Final | N/A | Canceled | Canceled per home owner. 4/3/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: T17CM02882
Permit Description: SFR
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2017 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 08/10/2017; Status: Approved; Inspector: JBURGE; Comment: Entered by JBURGE1 - } ; {Activity date: 08/02/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - GROUT SOLID STEM WALLS: #5 REBAR/BOLTS, "J" BOLTS AT 48" O.C.} | |
| 08/10/2017 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 08/10/2017; Status: Approved; Inspector: JBURGE; Comment: Entered by JBURGE1 - } ; {Activity date: 08/02/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - TYPICAL WALLS AT 32" - 48"; #4 REBAR AT 16" O.C.. OK TO GROUT PROGRESS AREAS.} | |
| 09/07/2018 | COT - RSBU - Sustainability | Passed | {Activity date: 09/07/2018; Status: Approved; Inspector: ESTEVENS; Comment: Entered by CMURPHY1 - } | |
| 01/11/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 01/11/2019; Status: Approved; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - 15 psi for 10 minutes } |
|
| 01/18/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 01/18/2019; Status: Approved; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - No leaks observed Green tracer wire from back of house towards HCS, underground plumbing in front is under slab in the garage future} ; {Activity date: 01/11/2019; Status: Denied; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - water leaking at elbow closest to street. AND no green tracer wire over 4 inch sewer pipe in yard.} |
|
| 05/17/2019 | COT - RSBU - Preslab | Passed | {Activity date: 05/17/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 05/14/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall complete forms for footing and slab. 2- Reference footing detail 1 S-1 showing the top rebar. 3- Shall wrap plumbing risers and any plumbing in concrete. 4- 20 feet of copper Ufer has been provided.} |
|
| 02/03/2020 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade. Reference Table E3803.1 2012 IRC} ; {Activity date: 05/17/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- 20 feet of copper #4 Ufer conductor provided in footing.} ; {Activity date: 05/14/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall complete forms for footing and slab. 2- Reference footing detail 1 S-1 showing the top rebar. 3- Shall wrap plumbing risers and any plumbing in concrete. 4- 20 feet of copper Ufer has been provided.} |
|
| 01/05/2021 | COT - RSBU - Roof Nailing | Passed | {Activity date: 01/05/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 07/13/2020; Status: Denied; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Denied. No contact number or name in Messages, no contractor listed. Please call your inspector for further information.} ; {Activity date: 05/16/2018; Status: Partial Approval; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*} | |
| 01/05/2021 | COT - LCBU - Framing | Passed | {Activity date: 01/05/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 07/13/2020; Status: Denied; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Denied. No contact number or name in Messages, no contractor listed. Please call your inspector for further information.} ; {Activity date: 09/07/2018; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by CMURPHY1 - submit revised plans to the city. } ; {Activity date: 02/05/2018; Status: Partial Approval; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - 1. PROVIDE APPROVED ENGINEERING FOR CHANGE IN ROOF FRAMING. 2. GENERAL FRAMING LOOK GOOD, RE-CALL WHEN WALL BRACING IS COMPLETED.} |
|
| 02/09/2021 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 02/09/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - } | |
| 02/09/2021 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 02/09/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - } | |
| 02/18/2021 | COT - BULD - SWG Clearance | Passed | {Activity date: 02/18/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } | |
| 11/12/2021 | COT - RSME - Mechanical Final | Passed | {Activity date: 11/12/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Close permit} |
|
| 11/12/2021 | RSME - Mechanical Progress | Passed | {Activity date: 11/12/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} | |
| 05/10/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
| 05/10/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade. Reference Table E3803.1 2012 IRC} |
|
| 05/10/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
| 05/10/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 05/10/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable.} ; {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
| 05/10/2022 | RSEL - Electrical Progress | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 02/03/2020; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Leave message with contact phone # for inspectors questions. } ; {Activity date: 01/30/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide 18 inches of cover from top of conduit piping to finish grade. Reference Table E3803.1 2012 IRC} |
|
| 05/10/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/17/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Steel reinforcement provided for the garage slab.} ; {Activity date: 08/08/2017; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE1 - COLUMN FOOTING #7; ENSURE DOUBLE #3 TIES AT THE TOP AND #3 RINGS AT 12" APART - DETAIL #2, PAGE S1.0. OK TO PLACE CONCRETE.} ; {Activity date: 07/24/2017; Status: Partial Approval; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - OK TO POUR, EXCEPT F7 POST FOOTING} ; {Activity date: 07/19/2017; Status: Denied; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - REBAR ISCORRECT, NEEDS TO BE 3" FROM THE EARTH} ; {Activity date: 07/17/2017; Status: Cancelled; Inspector: NORTH; Comment: Entered by BNORTH1 - } | |
| 09/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 03/13/2024 | RSBU - Building Final | Passed | ||
| 03/13/2024 | COT - RSEL - Electrical Final | Passed |