Permit: T16RW00003
Permit Details
Apply Date:
06/14/2016
Applicant:
SOUTHWEST GAS B*
Description:
Install approximately 66 feet of gas line along Catalina Avenue just South of Lester Street. This job will relocate pipe to mitigate conflicts associated with propose COT Columbus Wash Drainage Improvements (Job No. SR2A COT Plan No. D-2015-002) 8/19/16: REVISION 2, TO REPAIR ASPHALT
Contractors:
- ARIZONA PIPELINE COMPANY
Completed Inspections
Permit Status: Final
Permit Number: T16RW00003
Permit Description: Install approximately 66 feet of gas line along Catalina Avenue just South of Lester Street. This job will relocate pipe to mitigate conflicts associated with propose COT Columbus Wash Drainage Improvements (Job No. SR2A COT Plan No. D-2015-002)
8/19/16: REVISION 2, TO REPAIR ASPHALT
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2016 | TDOT-Routine Barricade Inspect | Bravin | Approved | permit was extended today and all repairs were complet today. The issue i had with todays work was Az pipeline did not want to remove the asphalt to the curb, which was agreed upon prior to work. This issue became bigger, but Tom adkins was notified and the right thing was done after some discussion. Work is complete |