Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2016 | TDOT-Routine Barricade Inspect | Approved | permit was extended today and all repairs were complet today. The issue i had with todays work was Az pipeline did not want to remove the asphalt to the curb, which was agreed upon prior to work. This issue became bigger, but Tom adkins was notified and the right thing was done after some discussion. Work is complete | |
| 08/19/2016 | TDOT-Routine Barricade Inspect | Continued | installing pipe on 7/20/16 8/2/16 temp patches 8/8/16 temp patches 8/16/16 temp patches in place permit has expired |
|
| 07/26/2016 | TDOT-Routine Barricade Inspect | Continued | ||
| 07/21/2016 | TDOT-Routine Barricade Inspect | Continued | ||
| 07/18/2016 | TDOT-Routine Barricade Inspect | Not ready for Inspection | ||
| 07/18/2016 | TDOT-Routine Barricade Inspect | Continued |