Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
06/07/2016
Applicant:
CENTURYLINK
Description:
Open Cut and trench to place 99' pf 1-4" pvc and place 48TA fiber optic handhole in roadside dirt area. Trench will cross N Swan Rd from southbound lanes to East of right of way line. Providing service to Chase Bank. Please note Centurylink is requesting overnight permit only due to heavy traffic during daytime. WORK ORDER # N.082286 09/01/2016 R1
Contractors:
  • FISHEL CONSTRUCTION COMPANY (FN)

Completed Inspections

Permit Status: Final
Permit Number: T16EX02219
Permit Description: Open Cut and trench to place 99' pf 1-4" pvc and place 48TA fiber optic handhole in roadside dirt area. Trench will cross N Swan Rd from southbound lanes to East of right of way line. Providing service to Chase Bank. Please note Centurylink is requesting overnight permit only due to heavy traffic during daytime. WORK ORDER # N.082286 09/01/2016 R1
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/30/2016 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Fishel repaired the sidewalk that i asked them to. The sidewalk was damaged installing the new manhole. 4 l.f on the east side of Swan. Small section of striping needs to be completed. No other issues

Documents

File Name Document Type  
T16EX02219.PDF EXCAVATION VIEW
T16EX02219 R1.PDF EXCAVATION VIEW