Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T16EX02219
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | Fishel repaired the sidewalk that i asked them to. The sidewalk was damaged installing the new manhole. 4 l.f on the east side of Swan. Small section of striping needs to be completed. No other issues | |
09/26/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | 9/21/16 Rick olsen on site, the trench was dug and pipe was installed, small section of pipe still needed 9/22/16 finished installing pipe, but broke a two in irrigation line for Chase bank, took awhile to find the shut off. Pipe was repaired during the day. 9/23/16 manhole was set on the East side of Swan. |
|
09/26/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | Fishel working on sidewalk repair, and slurrying pipe across speedway, 7 yards of slurry used today. I gave them permission to slurry for backfill because they could not get a supplier to deliver at night for such a small amount. Traffic control in place for a hour or so | |
09/21/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | 9/20/16 penhall saw cut road, it was a slow night, no excavation done. Rick Olsen in early to assure barricades removed by 5. No issues as of today, but slow going | |
09/20/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Started work on 9/19/16 at night, milling across swann and installing plates. No issues. made for a short night | |
08/16/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | no work, expired |