Permit Details

Status:
Final
Type:
Complete Closure
Address:
35 E TOOLE AV
Apply Date:
06/24/2015
Applicant:
CENTURY LINK (QWEST)
Description:
WHY: THIS WORK IS REQUIRED PER THE CITY OF TUCSON REQUESTS FOR CENTURYLINK TO RELOCATE AERIAL AND STRUCTURAL FACILITIES IN CONFLICT WITH THE CITY OF TUCSON DOWN TOWN LINKS PHASE III ROAD IMPROVEMENT 6TH STREET UNDERPASS TO BROADWAY BLVD. JOB #S30N PLAN #1-2013-018. CENTURYLINK IS IN ROAD RIGHT OF WAY BY PERMIT. CENTURYLINK RIGHT OF WAY RESEARCH PROVIDED NO PRIOR RIGHTS DOCUMATION FOR REENBURSMENTS RELATED TO CENTURYLINKS RELOCATION COSTS. FACILITIES TO BE RELOCATED ARE SERVICE AFFECTING (INNER OFFICE FIBER SERVICE FACILITIES, FACILITY 1 COPPPER FEEDER SERVICE FACILITIES, FACILITY 2 COPPER DISTRUBTION SERVICE FACILITIES). CITY OF TUCSON IS SLATED TO BEGIN CONSTRUCTION FRIST QUARTER 2016. CENTURYLINK IS SLATED TO BEGIN CONSTRUCTION 2ND QUARTER 2015.THIS WORK WILL TAKE PLACE .987 KF FROM THE TUCSON MAIN CENTRAL OFFICE ROUTE #1. Work Type: City of Tucson Capital Improvement Project; Curb Cut; Driveway Apron; HCS/Private Sewer; Manhole Adjustment; New Manhole; New Sidewalk; New Vertical Curbing; Pole Placement or Replacement; Pot Hole; Sidewalk or Driveway Repair; Trench; Utility Bore or Bore; Utility Cabinet Install CIP #: Job #s30N PLAN #1-2013-018
Contractors:
  • TELECOM

Completed Inspections

Permit Status: Final
Permit Number: T15TC01544
Permit Description: WHY: THIS WORK IS REQUIRED PER THE CITY OF TUCSON REQUESTS FOR CENTURYLINK TO RELOCATE AERIAL AND STRUCTURAL FACILITIES IN CONFLICT WITH THE CITY OF TUCSON DOWN TOWN LINKS PHASE III ROAD IMPROVEMENT 6TH STREET UNDERPASS TO BROADWAY BLVD. JOB #S30N PLAN #1-2013-018. CENTURYLINK IS IN ROAD RIGHT OF WAY BY PERMIT. CENTURYLINK RIGHT OF WAY RESEARCH PROVIDED NO PRIOR RIGHTS DOCUMATION FOR REENBURSMENTS RELATED TO CENTURYLINKS RELOCATION COSTS. FACILITIES TO BE RELOCATED ARE SERVICE AFFECTING (INNER OFFICE FIBER SERVICE FACILITIES, FACILITY 1 COPPPER FEEDER SERVICE FACILITIES, FACILITY 2 COPPER DISTRUBTION SERVICE FACILITIES). CITY OF TUCSON IS SLATED TO BEGIN CONSTRUCTION FRIST QUARTER 2016. CENTURYLINK IS SLATED TO BEGIN CONSTRUCTION 2ND QUARTER 2015.THIS WORK WILL TAKE PLACE .987 KF FROM THE TUCSON MAIN CENTRAL OFFICE ROUTE #1. Work Type: City of Tucson Capital Improvement Project; Curb Cut; Driveway Apron; HCS/Private Sewer; Manhole Adjustment; New Manhole; New Sidewalk; New Vertical Curbing; Pole Placement or Replacement; Pot Hole; Sidewalk or Driveway Repair; Trench; Utility Bore or Bore; Utility Cabinet Install CIP #: Job #s30N PLAN #1-2013-018
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/29/2015 TDOT-Routine Barricade Inspect ROLSON Approved

Documents

File Name Document Type  
T15TC01544.PDF BARRICADES VIEW
T15TC01544 R1.PDF BARRICADES VIEW
T15TC01544 R2.PDF BARRICADES VIEW
T15TC01544 R3.PDF BARRICADES VIEW
T15TC01544 R4.PDF BARRICADES VIEW
T15TC01544 R5.PDF BARRICADES VIEW
T15TC01544 R6.PDF BARRICADES VIEW
T15TC01544 R7 PLAN CHANGE.PDF BARRICADES VIEW
T15TC01544 R8.PDF BARRICADES VIEW
T15TC01544 R9.PDF BARRICADES VIEW
T15TC01544R10.PDF BARRICADES VIEW
T15TC01544 R11 PLN CHANGE.PDF BARRICADES VIEW