Permit: T15CM07949
Permit Details
Apply Date:
11/16/2015
Applicant:
KBP ARCHITECTURE LLC
Description:
AUTOMOTIVE REPAIR
Contractors:
- KBP ARCHITECTURE LLC
Permit Reviews
Permit Number - T15CM07949
Permit Status: C of o
Permit Description: AUTOMOTIVE REPAIR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2016 | RESUBMITTAL | 01/29/2016 | COMPLETED |
03/31/2016 | REVISION - - 1ST | 04/04/2016 | COMPLETED |
04/07/2016 | REVISION - - 2ND | 04/07/2016 | COMPLETED |
11/16/2015 | PLANS OK TO SUBMIT - COMM | 11/18/2015 | COMPLETED |
11/18/2015 | COMMERCIAL - NEW | 01/06/2016 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T15CM07949
Permit Status: C of o
Permit Description: AUTOMOTIVE REPAIR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/16/2015 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T15CM07949
Permit Description: AUTOMOTIVE REPAIR
Total Completed Inspections - 42
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2016 | EXCAVATION/LAYOUT REBAR & ZON | TVALENC1 | Approved | IVRS - Inspection :* |
04/04/2016 | PLUMBING - YARD WTR LINE/TEST | TVALENC1 | Approved | IVRS - Inspection :* |
04/07/2016 | PLUMBING - SEWER HCS CONNECT | rico | Approved | |
04/08/2016 | FIRE SPKLR - UG, PIPING, HYDRO | jvincent | Approved | UG piping/hydro approved. Still need flush. |
04/22/2016 | FIRE SPKLR - UG PIPING FLUSH | jvincent | Approved | |
05/15/2016 | ROOF NAILING | TVALENC1 | Approved | IVRS - Inspection :* |
05/24/2016 | BUILDING PRE-SLAB | RMORENO | Approved | IVRS - Inspection :* |
06/01/2016 | PLUMBING - INTERMEDIATE | TVALENC1 | Approved | IVRS - Inspection :* |
06/01/2016 | PLUMBING - ROUGH, SOIL | TVALENC1 | Approved | IVRS - Inspection :* |
06/02/2016 | FRAMING | TVALENC1 | Approved | IVRS - Inspection :* |
06/03/2016 | ELECTRIC - UNDERGROUND | MPUGH1 | Approved | IVRS - Inspection :* |
06/16/2016 | ELECTRIC - TEMPORARY SERVICE | TVALENC1 | Approved | IVRS - Inspection :* |
06/16/2016 | PLUMBING - ROOF DRAINS | TVALENC1 | Approved | IVRS - Inspection :* |
07/11/2016 | MECHANICAL - ABOVE CEILING | MPUGH1 | Approved | IVRS - Inspection :* |
07/11/2016 | PLUMBING - ABOVE CEILING | MPUGH1 | Approved | IVRS - Inspection :* |
07/11/2016 | ELECTRIC - ABOVE CEILING | MPUGH1 | Approved | IVRS - Inspection :* |
07/11/2016 | BUILDING ABOVE CEILING | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | MECHANICAL - FINAL | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | PLUMBING - FINAL | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | OUTDOOR LIGHTING FINAL | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | ELECTRIC - FINAL | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | ELECTRIC - OUTDOOR LIGHTING | MPUGH1 | Approved | IVRS - Inspection :* |
07/20/2016 | U VALUE FOR WINDOW | MPUGH1 | Approved | IVRS - Inspection :* |
07/21/2016 | FIRE - FINAL | jvincent | Approved | |
07/21/2016 | FIRE - ALARM FINAL | jvincent | Approved | |
07/21/2016 | FIRE SPKLR - FINAL | jvincent | Approved | |
07/21/2016 | FIRE SPKLR - OH PIPING & HYDRO | jvincent | Approved | per NS on 5/16 |
08/09/2016 | LANDSCAPE - FINAL | DROBERTS | Approved | LANDSCAPING IS BEING INSTALLED AT THIS TIME BUT WILL BE HELD AGAINST THE DP15-0119. |
08/09/2016 | NPPO - FINAL | DROBERTS | Approved | |
08/09/2016 | SIGN - FINAL | DROBERTS | Approved | |
08/09/2016 | LANDSCAPE - FINAL | MPUGH1 | Approved | IVRS - Inspection :* |
08/17/2016 | ELECTRIC - INTERMEDIATE | MPUGH | Approved | |
08/17/2016 | ELECTRIC - PROGRESS | MPUGH | Approved | |
08/17/2016 | SITE - SEWER | MPUGH | Approved | |
08/17/2016 | ELECTRIC - UFER | MPUGH | Approved | |
08/17/2016 | MECHANICAL - INTERMEDIATE | MPUGH | Approved | |
08/17/2016 | BUILDING - PROGRESS | MPUGH | Approved | |
08/17/2016 | REINFORCED MASONRY PRE-GROUT | MPUGH | Approved | |
09/15/2016 | ENGINEERING - FINAL | DROBERTS | Approved | I MET WITH THE ENGINEER OF RECORD AND THE CONTRACTOR ON SITE TO DISCUSS THAT ISSUES AT HAND. THE ADA RAMP HAS BEEN REOVED AND REPOURED AND IS LESS THAN 2% IN THE CROSS SLOPES AND OVER 5% IN THE RUNNING SLOPE. THEY HAVE COMPLETED THE HANDRAILS ON BOTH SIDES OF THE RAMP AT THIS TIME. THE OTHER ITEM THAT WAS PREVIOUSLY ADDRESSED IS THE ROOF DOWN DRAINS THAT DUMP WATER ONTO THE PEDESTRIAN REFUGE AREA ALONG THE LENGTH OF THE FRONT OF THE BUILDING(GARAGE DOOR AREAS). BOTH OF THE DRAINS DEPOSIT WATER INTO THE REFUGE AREA WHICH IS AGAINST OUR CODE. I HAVE ADVISED THE E.O.R. AND THE CONTRACTOR THAT I CAN NOT PASS THIS MYSELF BUT IF THE REVIEWERS AND THE BUILDING OFFICIAL AGREE THAT THE QUANTITY OF WATER DOES NOT AFFECT THE PEDESTRIAN AREA THEN THEY CAN DIRECT ME TO CLEAR THIS SITE. THIS INSPECTION HAS BEEN APPROVED AS DIRECTED BY THE REVIEW STAFF STEVE SHIELDS AND LOREN MAKUS PER THE FOLLOWING E-MAILS SENT ON THE ATTACHED DATES. STEVE SHIELDS: After review of the video I am comfortable with this. Please close the inspections so that the C of O can be issued. Steve Shields Planning & Development Services Department Principle Planner 520-837-4956 Steve.Shields@tucsonaz.gov DATED 09/16/2016 12:35 PM LOREN MAKUS: Steve, Kevin shared the video of the roof drain with me and I am comfortable with the pedestrian path remaining essentially floods free under these circumstances. Thank you Loren >>> Loren Makus <loren.makus@tucsonaz.gov> 09/15/2016 3:31 PM >>> |
09/15/2016 | BUILDING - FINAL | MPUGH | Approved | IF DAVE'S HAPPY, I"M HAPPY TO CLEAR IT. |
09/15/2016 | RIGHT OF WAY - FINAL | CASTRO | Approved | PER SHANAE POWELL |
09/15/2016 | RIGHT OF WAY - FINAL | TADKINS | Approved |