Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
02/18/2015
Applicant:
Description:
ADD PORCH, RV GARAGE AND DETACHED SHED

Permit Reviews

Permit Number - T15CM01074
Permit Status: Complete
Permit Description: ADD PORCH, RV GARAGE AND DETACHED SHED
Start Date Submittal Complete Date Status  
02/18/2015 RESIDENTIAL - BLDG/ZONING-WALKTHRU 02/18/2015 COMPLETED Review Details
02/20/2015 RESIDENTIAL - BLDG/WWM 03/18/2015 COMPLETED Review Details
03/26/2015 RESIDENTIAL - BLDG/WWM 02/22/2019 COMPLETED Review Details
03/22/2024 RESIDENTIAL NEW DWELLING v.1 03/25/2024 APPROVED Review Details

Conditions

Permit Number - T15CM01074
Permit Status: Complete
Permit Description: ADD PORCH, RV GARAGE AND DETACHED SHED
Date Description Comments
02/18/2015 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/17/2015 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/17/2015 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/25/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T15CM01074
Permite Description: ADD PORCH, RV GARAGE AND DETACHED SHED
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final N/A Not Ready
10/04/2023 COT - RSPL - Plumbing Final N/A Not Applicable Construction is complete on metal building. Plans do not show outdoor lighting, so none was installed, Owner doesn't want bathroom finished and is using space for storage at this time. Okay to issue Certificate of Completion.
10/04/2023 COT - RSEL - Outdoor Lighting N/A Not Applicable Construction is complete on metal building. Plans do not show outdoor lighting, so none was installed, Owner doesn't want bathroom finished and is using space for storage at this time. Okay to issue Certificate of Completion.

Completed Inspections

Permit Status: Complete
Permit Number: T15CM01074
Permit Description: ADD PORCH, RV GARAGE AND DETACHED SHED
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/03/2015 COT - RSBU - Preslab Passed {Activity date: 06/03/2015; Status: Approved; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - } ; {Activity date: 05/13/2015; Status: Partial Approval; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - OK TO POUR WEST HALF OF BLDG}
06/03/2015 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/03/2015; Status: Approved; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - } ; {Activity date: 05/13/2015; Status: Partial Approval; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - }
01/12/2017 COT - RSEL - Electrical Underground Passed {Activity date: 01/12/2017; Status: Approved; Inspector: MPUGH1; Comment: Entered by MPUGH1 - IVRS - Inspection :* ufer at house ok.} ; {Activity date: 01/10/2017; Status: Not ready for Inspection; Inspector: MPUGH1; Comment: Entered by MPUGH1 - IVRS - Inspection :*}
03/14/2017 COT - RSEL - Grounding/Bonding Passed {Activity date: 03/14/2017; Status: Approved; Inspector: mpugh1; Comment: Entered by MPUGH1 - } ; {Activity date: 03/10/2017; Status: Not ready for Inspection; Inspector: mpugh1; Comment: Entered by MPUGH1 - please expose UFER at shop} ; {Activity date: 03/08/2017; Status: Denied; Inspector: mramber1; Comment: Entered by GENINSP - no one home} ; {Activity date: 06/03/2015; Status: Partial Approval; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - }
02/14/2020 COT - RSEL - Service Upgrade Passed {Activity date: 02/14/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DQUINN1 - RVI} ; {Activity date: 08/31/2017; Status: Not ready for Inspection; Inspector: mpugh1; Comment: Entered by MPUGH1 - complete elec. @ shop, provide city plans, protect conducters within 8' of grade, bring equipment grounding conductor to new house panel, provide ground rods and gas/water bond at house panel, isolate neutral at house panel, terminate all conducters at new sub- panel, provide disconnect at each building, incomplete inspection.} ; {Activity date: 03/14/2017; Status: Partial Approval; Inspector: mpugh1; Comment: Entered by MPUGH1 - line side only} ; {Activity date: 03/10/2017; Status: Not ready for Inspection; Inspector: mpugh1; Comment: Entered by MPUGH1 - }
02/18/2020 BULD - Electrical Clearance Passed {Activity date: 02/18/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - PANEL ON RV GARAGE CODE INCR} ; {Activity date: 03/15/2017; Status: Approved; Inspector: MPUGH; Comment: Entered by FRODRIG2 - INCR}
08/13/2020 COT - RSBU - Roof Nailing Passed {Activity date: 08/13/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved}
08/13/2020 COT - LCBU - Framing Passed {Activity date: 08/13/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 08/24/2018; Status: Not ready for Inspection; Inspector: GWest; Comment: Entered by GWEST2 - No one home}
08/13/2020 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/13/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 02/28/2018; Status: Partial Approval; Inspector: RGREENE1; Comment: Entered by DROBERT5 - SEWER OKAY} ; {Activity date: 05/29/2015; Status: Partial Approval; Inspector: RCANCINO; Comment: Entered by RCANCINO - IVRS - Inspection :*}
04/03/2023 COT - RSEL - Electrical Final Passed
10/04/2023 RSBU - Building Final Passed Construction is complete on metal building. Plans do not show outdoor lighting, so none was installed, Owner doesn't want bathroom finished and is using space for storage at this time. Okay to issue Certificate of Completion.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
AB-PLACEMENT_V1.PDF DOCUMENTS VIEW
CONS-HS-BOLTS_V1.PDF DOCUMENTS VIEW
T15CM01074_INSPECTION-LETTER_V1.PDF DOCUMENTS VIEW
None CONSTRPLANS VIEW
001_X1.TIF CONSTRPLANS VIEW
002_S1.0.TIF CONSTRPLANS VIEW
003_S1.1.TIF CONSTRPLANS VIEW
004_S1.2.TIF CONSTRPLANS VIEW
005_S2.0.TIF CONSTRPLANS VIEW
006_S3.0.TIF CONSTRPLANS VIEW
007_A1.TIF CONSTRPLANS VIEW
008_A2.TIF CONSTRPLANS VIEW
009_A3.TIF CONSTRPLANS VIEW
010_D1.TIF CONSTRPLANS VIEW
011_P1.TIF CONSTRPLANS VIEW
012_E1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW