Permit: T15BU01232
Permit Details
Apply Date:
10/21/2015
Applicant:
ALLAN FIRE PROTECTION SYSTEMS
Description:
SPRINKLER
Contractors:
- ALLAN FIRE PROTECTION SYSTEMS
Outstanding Activity Conditions
Permit Number - T15BU01232
Permit Status: Final
Permit Description: SPRINKLER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/21/2015 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T15BU01232
Permit Description: SPRINKLER
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2015 | FIRE SPKLR - UG, PIPING, HYDRO | nsprenger | Approved | pressured up at 6:30 am, pressure read at 11:05 am, 225 psi bled off water joints to be wrapped before backfill as builts to be submitted with final building sprinkler inspection. |
| 12/09/2015 | FIRE SPKLR - FINAL | nsprenger | Approved | still need approved as-builts |
| 12/23/2015 | FIRE SPKLR - OH PIPING & HYDRO | nsprenger | Approved | read 225 psi |
| 12/23/2015 | FIRE SPKLR - UG PIPING FLUSH | nsprenger | Approved | Flushed clean; will be approved upon submittal of Contractors Material and Test Certificate for Underground Piping |