Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | pressured up at 6:30 am, pressure read at 11:05 am, 225 psi bled off water joints to be wrapped before backfill as builts to be submitted with final building sprinkler inspection. |
|
| 12/08/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | 1. was not pressured up to 200 psi 2. no tracer wire on pipe 3. need as builds showing change from original approved plans |