Permit: T15BU00389
Permit Details
Apply Date:
04/09/2015
Applicant:
RYAN NICKLE
Description:
270' 6" UNDERGROUND FIRE LINE
Contractors:
- NICKLE CONTRACTING L L C ,
Outstanding Activity Conditions
Permit Number - T15BU00389
Permit Status: Expired
Permit Description: 270' 6" UNDERGROUND FIRE LINE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/09/2015 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T15BU00389
Permite Description: 270' 6" UNDERGROUND FIRE LINE
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
FIRE SPKLR - FINAL | N/A | Not Inspected |
Completed Inspections
Permit Status: Expired
Permit Number: T15BU00389
Permit Description: 270' 6" UNDERGROUND FIRE LINE
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2015 | FIRE SPKLR - UG, PIPING, HYDRO | nsprenger | Approved | Pressure tested before the flush. Was charged at 7 AM at 200 psi. Was still at 200 psi at 11:30 am this morning at test. Bled pressure off and prepared for flush. NS |
04/23/2015 | FIRE SPKLR - UG PIPING FLUSH | nsprenger | Approved | Flushed for 2 minutes running clear out of a 4 inch line off of a 90 angle from the incoming 6 inch supply for the riser. |