Permit Details

Status:
Closed
Type:
STREET EXCAVATION
Apply Date:
05/09/2014
Applicant:
MAGNUM PAVING INC ,
Description:
STREET CUTS AT 4 LOCATIONS FOR 132LF EACH FOR SEWER BETWEEN PINAL VISTA AND DUVALL VISTA. EAST SIDE OF CAMPBELL AVE.

Outstanding Activity Conditions

Permit Number - T14EX00545
Permit Status: Closed
Permit Description: STREET CUTS AT 4 LOCATIONS FOR 132LF EACH FOR SEWER BETWEEN PINAL VISTA AND DUVALL VISTA. EAST SIDE OF CAMPBELL AVE.
Total Outstanding Activity Conditions - 5
Date Name
05/09/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
05/09/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
05/09/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JAMES CASTRO AT 520-400-6609 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.
05/09/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
05/09/2014 a. The Contractor must obtain an Excavation and Barricading Permits from the City of Tucson Transportation Engineering Division prior to any work in the City Public right-of-ways. b. The Contractor must meet with the City's right-of-way inspector prior to any work in the public right-of-way. c. All backfill, within the City of Tucson right-of-way, above the utility shading shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way Inspector and City Engineer. d. All pavement patching, within the City of Tucson right-of-way, shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way Inspector and City Engineer. e. In accordance to the City of Tucson Standards, pavement patching shall be warrantied for 5-years, pavement patch's failing within this period shall be repaired/replaced at no cost to the City of Tucson.