Permit Details

Status:
Closed
Type:
STREET EXCAVATION
Address NEW:
1321 W SPEEDWAY BL
Apply Date:
04/01/2014
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
REPAIR 4" SEWER IN ASPHALT - SPEEDWAY - 4' WIDE x 12' LONG

Outstanding Activity Conditions

Permit Number - T14EX00278
Permit Status: Closed
Permit Description: REPAIR 4" SEWER IN ASPHALT - SPEEDWAY - 4' WIDE x 12' LONG
Total Outstanding Activity Conditions - 4
Date Name
04/01/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
04/01/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
04/01/2014 CAUTION STORM DRAINS IN THE AREA. STORM DRAINS ARE NOT BLUE STAKED AND CONTRACTOR IS RESPONSIBLE FOR VERIFYING STORM DRAIN LOCATION. CONTACT COT MAPS & RECORDS AT 520-791-4259 FOR STORM DRAIN AS-BUILT PLANS. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED / REPLACED AT NO COST TO THE CITY.
04/01/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.