Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
DUPLEX ALTERATION
Address:
820 N PERRY AV
Address NEW:
820 N PERRY AV
Apply Date:
01/08/2014
Applicant:
MAURICE BROWN
Description:
REMODEL:INTERIOR REPAIRS - DUPLEX R1: AS BUILT REVISIONS. SLAB FLOOR, WINDOW SIZES, INTERIOR WALLS
Contractors:
  • CIMETTA ENGINEERING AND CONSTRUC

Permit Reviews

Permit Number - T14CM00128
Permit Status: Final
Permit Description: REMODEL:INTERIOR REPAIRS - DUPLEX R1: AS BUILT REVISIONS. SLAB FLOOR, WINDOW SIZES, INTERIOR WALLS
Start Date Submittal Complete Date Status  
01/08/2014 PLANS OK TO SUBMIT - RES 01/08/2014 COMPLETED Review Details
01/08/2014 RESIDENTIAL - BLDG/WWM 02/07/2014 COMPLETED Review Details
03/06/2014 RESUBMITTAL 04/02/2014 COMPLETED Review Details
04/21/2016 REVISION - - 2ND 04/28/2016 COMPLETED Review Details
09/08/2015 REVISION - - 1ST 09/08/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T14CM00128
Permit Status: Final
Permit Description: REMODEL:INTERIOR REPAIRS - DUPLEX R1: AS BUILT REVISIONS. SLAB FLOOR, WINDOW SIZES, INTERIOR WALLS
Total Outstanding Activity Conditions - 1
Date Name
01/08/2014 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T14CM00128
Permit Description: REMODEL:INTERIOR REPAIRS - DUPLEX R1: AS BUILT REVISIONS. SLAB FLOOR, WINDOW SIZES, INTERIOR WALLS
Total Completed Inspections - 25
Date Description Inspector Results Comments
05/11/2015 PLUMBING - SEWER HCS CONNECT RLEDONNE Approved ROUGH SOIL IN STALLED PER AP PLANS.
06/26/2015 BUILDING PRE-SLAB MPUGH Approved CHANGED FROM AP TO PA TO ALLOW FOR REINSPECTION PER REVISION
12/02/2015 FRAMING BSTEVENS Approved
12/02/2015 STUCCO MESH BSTEVENS Approved
12/03/2015 U VALUE FOR WINDOW BSTEVENS Approved
12/03/2015 ELECTRIC - INTERMEDIATE BSTEVENS Approved
12/03/2015 PLUMBING - INTERMEDIATE BSTEVENS Approved
12/03/2015 PLUMBING - GAS PRESSURE TEST BSTEVENS Approved
12/03/2015 MECHANICAL - INTERMEDIATE BSTEVENS Approved
05/10/2016 ELECTRIC - TEMPORARY SERVICE INGRAM Approved
05/10/2016 ELECTRIC - UFER INGRAM Approved
05/18/2016 REINFORCED MASONRY PRE-GROUT BSTEVENS Approved
06/01/2016 ROOF NAILING BSTEVENS Approved
06/01/2016 EXT METAL CLIPS/EXT SHEATHING BSTEVENS Approved
08/25/2016 PLUMBING - YARD WTR LINE/TEST BSTEVENS Approved
08/25/2016 SHEET ROCK NAILING BSTEVENS Approved
08/30/2016 PLUMBING - GAS PRESS TEST FNL BSTEVENS Approved
10/13/2016 MECHANICAL - FINAL BRUCE_S Approved
10/13/2016 PLUMBING - FINAL BRUCE_S Approved
10/13/2016 OUTDOOR LIGHTING FINAL BRUCE_S Approved
10/13/2016 ELECTRIC - FINAL BRUCE_S Approved
10/13/2016 ELECTRIC - SERVICE UPGRADE BRUCE_S Approved
10/13/2016 BUILDING - FINAL BRUCE_S Approved
10/13/2016 EXCAVATION/LAYOUT REBAR & ZON BRUCE_S Approved
10/14/2016 GAS CLEARANCE BSTEVENS Approved

Documents

File Name Document Type  
None CONSTRPLANS VIEW
001_COVERSHEET.TIF CONSTRPLANS VIEW
002_C-1.TIF CONSTRPLANS VIEW
003_A-1.TIF CONSTRPLANS VIEW
004_A-2.TIF CONSTRPLANS VIEW
005_A-3.TIF CONSTRPLANS VIEW
006_A-4.TIF CONSTRPLANS VIEW
007_A-5.TIF CONSTRPLANS VIEW
008_A-6.TIF CONSTRPLANS VIEW
009_A-7.TIF CONSTRPLANS VIEW
010_M-1.TIF CONSTRPLANS VIEW
011_P-1.TIF CONSTRPLANS VIEW
012_P-2.TIF CONSTRPLANS VIEW
013_E-1.TIF CONSTRPLANS VIEW
014_E-2.TIF CONSTRPLANS VIEW
015_LS-1.TIF CONSTRPLANS VIEW
016_LS-2.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW