Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
125 W YAVAPAI RD
Address NEW:
125 W YAVAPAI RD
Apply Date:
12/12/2012
Applicant:
JESSE ROSS
Description:
FUP - T12CM07840 ADDITION / TI ; HIGH SCHOOL

Permit Reviews

Permit Number - T12OT01659
Permit Status: Final
Permit Description: FUP - T12CM07840 ADDITION / TI ; HIGH SCHOOL
Start Date Submittal Complete Date Status  
01/25/2013 RESUBMITTAL 03/29/2013 COMPLETED Review Details
12/12/2012 PLANS OK TO SUBMIT - FLOODPLAIN 12/12/2012 COMPLETED Review Details
12/12/2012 FLOODPLAIN 01/25/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T12OT01659
Permit Status: Final
Permit Description: FUP - T12CM07840 ADDITION / TI ; HIGH SCHOOL
Total Outstanding Activity Conditions - 1
Date Name
01/30/2013 The following 11 conditions apply to permits T12OT01659 and DP13-0012: 1) PDSD Engineering Inspections are required prior to final floodplain inspection. For a PDSD Engineering Inspection, call IVR (740-6970), or contact PDSD Engineering at 837-4991, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) See also any associated building permit (T12CM07840), and grading permit (DP13-0012). 3) To assess cumulative substantial improvement, cost estimate ($1,537,321.00) was provided showing that the improvements are less than 50% indicating a cumulative total percentage of 9.3% of the assessed value of the structure, as shown on data provided by the consultant. No person shall repair or alter property in a piecemeal manner so as to avoid the provisions of Section 26-4.1.a.3, Chapter 26-Tucson Code. The estimate will be recorded and any future improvements will be added to it. Estimated cost of improvement (renovation and new construction) = $1,537,321.00 Assessed value of the existing structure = $16,532,820.00 (bldg) Cumulative percentage of improvements to the existing structure: $1,537,321/ $16,532,820 = 9.3% 4) Floodplain Use Permit & plans shall be kept in readily accessible location on site at all times. Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T12OT01659. FOR INFORMATION PLEASE CALL 791-5550." 5) All future improvements to each structure will be cumulative in percentage, to include this project. 6) The proposed improvements shall not impose conditions that would increase the flood damage potential to the combined proposed and existing building, by 50 percent or greater of the existing structure's value. 7) When the cumulative improvements equal or exceed 50% of the current value of the structure; no other improvements will be permitted unless the entire structure is brought into compliance with the City of Tucson Floodplain and Erosion Hazard Area Regulations (Chapter 26, Tucson Code). If the project is determined to be a substantial improvement, and, if it is determined that the lowest flood elevation is below the regulatory floor elevation, a design submittal, and review and acceptance of the submittal for floodproofing will be required and shall conform to current City of Tucson and FEMA floodplain development requirements in effect on the date of authorization by the Development Services Department. 8) No disturbance is permitted other than area within the lot and as shown on the approved plans. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 9) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the improvement, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from development within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson. 10) The applicant attests to the fact that the plans and documents submitted represent all of the improvements that will be done to the existing building, and that all additions, improvements or repairs to the building are included in the construction plans and/or documents herewith. No other improvements, repairs, reconstruction, additions or remodeling have been made to the structure that is not indicated in the attached plans and/or documents. 11) If any walls are to be built, separate permits are required, at-grade wall openings will be needed, & will need to be inspected by City of Tucson PDSD Engineering.

Documents

File Name Document Type  
None DOCUMENTS VIEW