Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
10/26/2012
Applicant:
KAZAL FIRE PROTECTION INC ,
Description:
Add 60, relocate 2 fire sprinklers
Contractors:
  • KAZAL FIRE PROTECTION INC ,

Outstanding Activity Conditions

Permit Number - T12BU01286
Permit Status: Final
Permit Description: Add 60, relocate 2 fire sprinklers
Total Outstanding Activity Conditions - 1
Date Name
10/26/2012 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T12BU01286
Permit Description: Add 60, relocate 2 fire sprinklers
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/14/2012 FIRE SPKLR - OH PIPING & HYDRO CBASALDU Approved
12/18/2012 FIRE SPKLR - FINAL CSCHULTZ Approved Painted sprinkler heads in the following areas:
1.) Loading dock area by roof ladder
2.) By 3rd column from south wall then 3 more heads on same line going east ward.
3.) By new concentrail A/C unit
4.) By PF Tucson wall
5.) In women's bathroom back north corner
6.) 2nd floor mezzanine taped and painted south wall windows

1.) Straighten sprinkler piping on 2nd floor mezzanine where drops were removed.
2.) Two sprinkler heads to close to each other by the northwest stairs 2nd floor mezzanine and 1st floor southwest corner by the PF Tucson wall
3.) Correct sprinkler coverage in the large storage room 2nd floor and by the stairs going down to 1st floor northeast.
4.) Correct sprinkler coverage in the sun tanning rooms blocked by units x5