Permit: T11CM00230
Permit Details
Apply Date:
01/27/2011
Applicant:
N/A
Description:
TI:BARBER SHOP
Contractors:
- ARIZONA HARD ROCK CONSTRUCTION AND DEVELOPMENT
Permit Reviews
Permit Number - T11CM00230
Permit Status: Expired
Permit Description: TI:BARBER SHOP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/27/2011 | COMMERCIAL - TI | 02/03/2011 | COMPLETED |
| 11/15/2011 | REVISION - - 1ST | 11/16/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM00230
Permit Status: Expired
Permit Description: TI:BARBER SHOP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/27/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T11CM00230
Permite Description: TI:BARBER SHOP
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
| ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
| PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
| PLUMBING - GAS PRESSURE TEST | N/A | Not Inspected | ||
| 11/10/2011 | PLUMBING - PROGRESS | N/A | Not ready for Inspection | 1) LAST KNOWN OCCUPANCY OF THIS BLDG WAS A SEAFOOD RESTAURANT. NOT IT IS A COMPLETED BARBER SHOP. PROVIDE DEMO PLAN SHOWING HOW FLOOR SINKS, FLOOR DRAINS, GREASE WASTE AND WATER PIPING DISTRIBUTION AND DWV ISOMETRIC 2) PLAN SHOWS 2 LAVS CHANGING TO SHAMPOO BOWLS. SHOW HOW SECOND HISTORY WAS CAPPED OFF. ONE SHAMPOO BOWL WAS MOVED TO WALL NEXT TO WATER HEATER. SHOW HOW THE PLUMBING WAS CONNECTED BELOW GRADE AND TEST 3) RPPBP AT WATER SERVICE MAKES THIS A CLOSED SYSTEM, REQUIRE EXPANSION TANK AND RPPBP CERT 4) WILL REQUIRE STERILIZATION AND CLEAN BACTERIA REPORT |
Completed Inspections
Permit Status: Expired
Permit Number: T11CM00230
Permit Description: TI:BARBER SHOP
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2011 | RIGHT OF WAY - FINAL | LHANLY | Approved | |
| 11/02/2011 | NPPO - FINAL | LHANLY | Approved | |
| 11/02/2011 | SIGN - FINAL | LHANLY | Approved | |
| 11/02/2011 | LANDSCAPE - FINAL | LHANLY | Approved | |
| 11/02/2011 | ENGINEERING - FINAL | LHANLY | Approved | |
| 11/08/2011 | FIRE - FINAL | WMOTTO | Approved | |
| 11/09/2011 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* |
| 11/09/2011 | ELECTRIC - RECONNECT | RMORENO | Approved | IVRS - Inspection :* |
| 11/10/2011 | TEP CLEARANCE - AM | JWEATHER | Approved | RECN CLEARED PER R. MORENO |
| 11/28/2011 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1) PER TUCSON POLICY, HELD OVER INSPECTIONS ARE TO BE PERFORMED FIRST ON THE FOLLOWING WORK DAY. 8:30 AM DOOR IS LOCKED 2) PLEASE CALL ME DIRECTLY, AT YOUR EARLIEST CONVENIENCE AND I WILL TRY TO COME BACK TODAY TO HELP YOU THRU THIS FINAL STEP REINSPECTED 9:00 AM: 1) CORRECTIONS MADE OK 3) OWNER TO MODIFY LAV DRAIN |
| 11/28/2011 | BUILDING - FINAL | RMYERS | Approved | IVRS - Inspection :* |