Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T11BU01068
Permit Details
Apply Date:
08/17/2011
Applicant:
BRIGHT, RICK LANE
Description:
REMODEL existing drainage under an existing pedestrian sidewalk. Remodel is to also fix foundation problems due to settling.
Architects:
- BRIGHT, RICK LANE
Contractors:
- HYMARK CONSTRUCTION ASSOCIATES L L C
Permit Reviews
Permit Number - T11BU01068
Permit Status: Final
Permit Description: REMODEL existing drainage under an existing pedestrian sidewalk. Remodel is to also fix foundation problems due to settling.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/17/2011 | GRADING | 08/17/2011 | COMPLETED |
08/17/2011 | GRADING | 08/26/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11BU01068
Permit Status: Final
Permit Description: REMODEL existing drainage under an existing pedestrian sidewalk. Remodel is to also fix foundation problems due to settling.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/17/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T11BU01068
Permit Description: REMODEL existing drainage under an existing pedestrian sidewalk. Remodel is to also fix foundation problems due to settling.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2011 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | NO ONE CALLED AN INSPECTION IN FOR A PRE-CON MEETING. FIRST INSPECTION ON SITE WAS FOR INTERMEDIATE GRADING. 9/1/11 |
09/07/2011 | GRADING - TIER REV | jgreen | Approved | Applicant brought the approved plans back in and made the changes as shown with clouded revisions. 1) solid concrete with rebar instead of the grouted CMU; 2) 4-inch down spouts extend thru the headwall and no longer tie intot he 18-inch piper (per Bob Sherry); and 3) Both invert elevations for u/s and d/s ends have been added, slope is now 1.4% not the 1.2%. |
09/08/2011 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* 1) HDPE IS NOT APPROVED UNDER A BLDG, PLEASE SEE RWS FOR CLARIFICATION |
09/08/2011 | PLUMBING - GAS PRESS TEST FNL | BBENEDON | Approved | IVRS - Inspection :* |
09/08/2011 | PLUMBING - GAS PRESSURE TEST | BBENEDON | Approved | IVRS - Inspection :* |
09/08/2011 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* |
09/08/2011 | GRADING - INTERMEDIATE | MRUSSO | Approved | 1) STORM WATER CONVEYANCE PIPE IN PLACE. 2) ROOF DRAINS HAVE BEEN INSTALLED 3) ENSURE AN ELEVATION READING IS TAKEN AT THE INLET AND OUTLET TO STORM DRAIN PIPE. 4) OK TO BACKFILL 5) ENSURE CHANGES MADE TO ORIGINAL GRADING PLAN IS APPROVED. |
11/02/2011 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* 1) EAST SIDE SHOWER DEMO, ADD TOILETS DWV OK |
08/24/2012 | GRADING - FINAL | DROBERTS | Approved |