Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2012 | GRADING - INTERMEDIATE | Approved | ||
| 09/08/2011 | GRADING - INTERMEDIATE | Continued | 1) STORM WATER CONVEYANCE PIPE IN PLACE. 2) ROOF DRAINS HAVE BEEN INSTALLED 3) ENSURE AN ELEVATION READING IS TAKEN AT THE INLET AND OUTLET TO STORM DRAIN PIPE. 4) OK TO BACKFILL 5) ENSURE CHANGES MADE TO ORIGINAL GRADING PLAN IS APPROVED. |
|
| 09/06/2011 | GRADING - INTERMEDIATE | Continued | 1) PROVIDE AN APPROVAL BY THE CITY OF TUCSON FOR THE CHANGES MADE TO THE APPROVED DRAWINGS. TO INCLUDE CHANGES MADE TO THE HEADWALLS SHOWN AT THE INLET AND OUTLET TO THE STORM PIPE. 2) SHOW WHICH OPTION WAS USED FOR THE ROOF DRAINS INSTALLED UNDER THE APPROVED PLANS. 3) PROVIDE AN AS-BUILT ELEVATION FOR THE INLET AND OUTLET TO THE STORM PIPE BEING INSTALLED. APPROVED PLANS SHOW SLOPE AT 1.2% |