Permit: T10CM01184
Permit Details
Apply Date:
04/29/2010
Applicant:
N/A
Description:
SOLAR DHW SYSTEM W/TANK REPLACEMENT FROM GAS TO ELECTRIC
Contractors:
- SOLAR PLUS L L C
Permit Reviews
Permit Number - T10CM01184
Permit Status: Final
Permit Description: SOLAR DHW SYSTEM W/TANK REPLACEMENT FROM GAS TO ELECTRIC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2010 | RESIDENTIAL BLDG/ZONING-WALKTHRU | 04/29/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM01184
Permit Status: Final
Permit Description: SOLAR DHW SYSTEM W/TANK REPLACEMENT FROM GAS TO ELECTRIC
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/29/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10CM01184
Permit Description: SOLAR DHW SYSTEM W/TANK REPLACEMENT FROM GAS TO ELECTRIC
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2010 | BUILDING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 06/23/2010 | PLUMBING - FINAL | RFREIDIN | Approved | IVRS - Inspection :* 1) ELECTRIC NOT ON PERMIT, NOT WRITTEN UP AT LAST INSPECTION 2) NEW SUB PANEL INSTALLED 3) A GROUNDING PROBLEM EXISTS 4) THIS PAN HAS NEUTRAL AND GROUNDS THAT NEED TO BE ISOLATED ON DIFFERENT BARS 5) THE GROUND BAR THEN NEEDS TO BE BONDED TO THE METAL CABINET, THE NEUTRAL ISOLATED. THEN RUN A WIRE BACK TO SERVICE PANEL |