Permit: T10CM01045
Permit Details
Apply Date:
04/19/2010
Applicant:
N/A
Description:
TI:BODY SHOP
Architects:
- FIELDS, JAMES SLOAN
Contractors:
- J 3 CONSTRUCTION L L C
Permit Reviews
Permit Number - T10CM01045
Permit Status: C of o
Permit Description: TI:BODY SHOP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/19/2010 | COMMERCIAL TI | 04/22/2010 | COMPLETED |
| 04/22/2010 | SITE | 04/22/2010 | COMPLETED |
| 06/11/2010 | REVISION - - 1ST | 06/15/2010 | COMPLETED |
| 06/15/2010 | REVISION - - 2ND | 06/15/2010 | COMPLETED |
| 11/17/2010 | REVISION - - 3RD | 11/17/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM01045
Permit Status: C of o
Permit Description: TI:BODY SHOP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/19/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T10CM01045
Permit Description: TI:BODY SHOP
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2010 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* 1) OK WALLS RESTROOMS AND CEILINGS 2) PLANS CALL FOR PAINT BOOTH TO BE LISTED BY ETL. COULD NOT LOCATE LISTING LABEL FROM ETL LABORATORY FOR PAINT BOTH. NEED TO PROVIDE INSPECTOR WITH LOCATION OF LISTING LABEL OR NEED TO HAVE FIELD EVALUATION DONE BY NRTL ON PAINT BOOTHS. THIS INSPECTOR HAD SAME ISSUE WITH GLOBAL FINISHING SOLUTIONS BOOTHS AT 5133 E. 22ND ST AND MET LABS CAME OUT. DID FIELD EVALUATION ON 2 PAINT BOOTHS AT ABOVE ADDRESS. WIRING TO PAINT BOOTH EQUIPMENT IS NOT COMPLETED AT THIS TIME 3) WIRING AND EMT INSTALLATION TO DISCONNECTING MEANS IS OK |
| 10/15/2010 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* 1) RE-WORK OF WATER AND DWV IN RESTROOM OK 2) CLOSET FLANGES EXISTING OK |
| 10/15/2010 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* |
| 10/15/2010 | FRAMING | MHENSON | Approved | IVRS - Inspection :* |
| 11/12/2010 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* 1) OK TO TAPE |
| 12/03/2010 | PLUMBING - GAS PRESSURE TEST | BBENEDON | Approved | IVRS - Inspection :* 1) POST YOUR ADDRESS |
| 01/05/2011 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
| 01/05/2011 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | |
| 01/05/2011 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* PROVIDE AN APPROVED GUARD RAIL AT MAKE UP IN UNIT PER 2006 IMC PROVIDE ROOF JACKS AT WATER SUPPLY + COOLER DRAIN. OK TO TERMINATE COOLER CHAIN INTO FLOOR SINK. PROVIDE COVER OVER FAN MOTOR + BELTS IN ROOF. INSTALL EXHAUST DUCT PER DETAILS ON PLANS, BLOCKING MISSING. |
| 01/05/2011 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 01/12/2011 | FIRE SPKLR - FINAL | DSIWARSKI | Approved | |
| 01/21/2011 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 01/21/2011 | NPPO - FINAL | JFEMLING | Approved | Approved |
| 01/21/2011 | LANDSCAPE - FINAL | JFEMLING | Approved | Approved |
| 01/21/2011 | ENGINEERING - FINAL | JFEMLING | Approved | Approved |
| 01/21/2011 | RIGHT OF WAY - FINAL | P.Whiddon | Approved | |
| 01/25/2011 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* DP POLE HAS BEEN REMOVED FROM THI SITE; OK TO CLEAR FOR C/O; PHOTOS ATTACHED TO SIRE |
| 01/28/2011 | FIRE - FINAL | DSIWARSKI | Approved | |
| 01/28/2011 | BUILDING - FINAL | GDABBS | Approved |