Permit: T10BU01442
Permit Details
Apply Date:
09/17/2010
Applicant:
MARK MARTIN
Description:
GRADING FOR NEW PARKING LOT AND PAVING
Contractors:
- CANYON BUILDING AND DESIGN L L C **C
Permit Reviews
Permit Number - T10BU01442
Permit Status: Expired
Permit Description: GRADING FOR NEW PARKING LOT AND PAVING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2011 | REVISION - GRADING | 05/13/2011 | COMPLETED |
| 05/13/2011 | REVISION - GRADING | 06/28/2011 | COMPLETED |
| 06/28/2011 | RESUBMITTAL - GRADING ALL | 07/26/2011 | ACTIVE |
| 09/17/2010 | GRADING | 09/17/2010 | COMPLETED |
| 10/04/2010 | REVISION - GRADING | 10/04/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01442
Permit Status: Expired
Permit Description: GRADING FOR NEW PARKING LOT AND PAVING
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 09/17/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 10/04/2010 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
| 10/04/2010 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 10/04/2010 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 10/04/2010 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/04/2010 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 10/04/2010 | SPECIAL INSPECTION IS REQUIRED FOR STEEL DETAILS . |
Outstanding Inspections
Permit Status: Expired
Permit Number: T10BU01442
Permite Description: GRADING FOR NEW PARKING LOT AND PAVING
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| GRADING - TIER REV | N/A | Not Inspected | ||
| 03/04/2011 | LANDSCAPE INSPECTION | N/A | Denied | See comments under T08Cm01920 |
| 09/14/2010 | ENGINEERING PRE-CONSTRUCTION | N/A | Correction Required | PRECON MEETING WITH MARK-GENERAL CONTRACTOR AND DAVID YOUNG WITH EAGLE ROCK. CURRENT PORTION OF SITE (S/W CORNER OF SITE) AT BLUE-TOP READY TO PAVE. |
| 09/14/2010 | STORMWATER INSTALL OF CONTROLS | N/A | Correction Required | STORMWATER CONTROLS WERE NOT PUT IN PLACE FOR THE SOUTHERN PARKING LOT. BASIN WILL NEED TO BE CERTIFIED PRIOR TO FULL COFO RELEASE. |