Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/14/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Correction Required |
PRECON MEETING WITH MARK-GENERAL CONTRACTOR AND DAVID YOUNG WITH EAGLE ROCK. CURRENT PORTION OF SITE (S/W CORNER OF SITE) AT BLUE-TOP READY TO PAVE. |
| 09/09/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Correction Required |
NO PRE-CON CALLED IN. NO GRADING PLAN CALLED FOR. RESOLVED PROBLEM WITH DSD ENGINEERING. CONTRACTOR MUST COME IN AND GET GRADING PERMIT. PERMIT #ISSUED |