Permit Details

Status:
Final
Type:
Grading
Apply Date:
06/23/2010
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
GRADING PLAN D10-0021
Contractors:
  • BETTER BUILT BUILDERS INC *

Permit Reviews

Permit Number - T10BU01007
Permit Status: Final
Permit Description: GRADING PLAN D10-0021
Start Date Submittal Complete Date Status  
07/30/2010 RESUBMITTAL - GRADING 07/30/2010 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T10BU01007
Permit Status: Final
Permit Description: GRADING PLAN D10-0021
Total Outstanding Activity Conditions - 1
Date Name
06/23/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU01007
Permit Description: GRADING PLAN D10-0021
Total Completed Inspections - 8
Date Description Inspector Results Comments
08/10/2010 STORMWATER INSTALL OF CONTROLS MRUSSO Approved SPOKE WITH SUPEINTENDENT ABOUT PROJECT. CONSTRUCTION IS < 1 AC NO SWPPP REQUIRED; HOWEVER CONTRACTOR MUST PREVENT TRACKING OF SOIL ONTO PUBLIC ROADWAYS AND PROTECT AN EXISTING STORM WATER CATCH BASIN.

CONTRACTOR MUST SWEEP UP SOIL OFF OF ADJACENT ROADWAY AND CLEAN OUT CATCH BASIN PRIOR TO FINAL APPROVAL FOR GRADING.
A STABILIZED ROCK CONSTRUCTION ENTRANCE WAS INSTALLED.
NO OTHER CONCERNS AT THIS TIME
08/10/2010 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved SPOKE WITH SUPEINTENDENT ABOUT PROJECT. CONSTRUCTION IS < 1 AC NO SWPPP REQUIRED; HOWEVER CONTRACTOR MUST PREVENT TRACKING OF SOIL ONTO PUBLIC ROADWAYS AND PROTECT AN EXISTING STORM WATER CATCH BASIN.

CONTRACTOR MUST SWEEP UP SOIL OFF OF ADJACENT ROADWAY AND CLEAN OUT CATCH BASIN PRIOR TO FINAL APPROVAL FOR GRADING.

NO OTHER CONCERNS AT THIS TIME
08/27/2010 GRADING - INTERMEDIATE MRUSSO Approved ALL SITE WORK IS COMPLETED, WORK CONSISTED OF REMODELING THE EXISTING BLDG AND ADDING A PARKING LOT ALONG THE WEST SIDE OF THE BLDG.

SITE WAS LESS THAN 1 AC, NO SWPPP REQUIRED.

SOME SMALL CHANGES TO ROOF DRAIN FLOW ALONG THE NORTH SIDE OF THE BLDG AND THE ADJACENT LOADING RAMP (DOWN SLOPE) . SMALL SPEED BUMP WAS ADDED TO THE ENTRANCE TO THE RAMP AND ELEVATION AT THE HIGH POINT WAS RAISED SLIGHTLY TO ALLOW STORM WATER TO DRAIN AROUND RAMP AND NOT INTO IT.
08/27/2010 GRADING - FINAL MRUSSO Approved ALL SITE WORK IS COMPLETED, WORK CONSISTED OF REMODELING THE EXISTING BLDG AND ADDING A PARKING LOT ALONG THE WEST SIDE OF THE BLDG.

SITE WAS LESS THAN 1 AC, NO SWPPP REQUIRED.

SOME SMALL CHANGES TO ROOF DRAIN FLOW ALONG THE NORTH SIDE OF THE BLDG AND THE ADJACENT LOADING RAMP (DOWN SLOPE) . SMALL SPEED BUMP WAS ADDED TO THE ENTRANCE TO THE RAMP AND ELEVATION AT THE HIGH POINT WAS RAISED SLIGHTLY TO ALLOW STORM WATER TO DRAIN AROUND RAMP AND NOT INTO IT.
08/27/2010 GRADING - TIER REV MRUSSO Approved SOME SMALL CHANGES TO ROOF DRAIN FLOW ALONG THE NORTH SIDE OF THE BLDG AND THE ADJACENT LOADING RAMP (DOWN SLOPE) . SMALL SPEED BUMP WAS ADDED TO THE ENTRANCE TO THE RAMP AND ELEVATION AT THE HIGH POINT WAS RAISED SLIGHTLY TO ALLOW STORM WATER TO DRAIN AROUND RAMP AND NOT INTO IT.
09/22/2010 PERMIT FINALED KMEDINA Approved
06/19/2019 GRADING - REBAR RLEDONNE Approved
06/19/2019 GRADING - CHECK FOR ACTIVITY RLEDONNE Approved