Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2010 | STORMWATER INSTALL OF CONTROLS | Approved | SPOKE WITH SUPEINTENDENT ABOUT PROJECT. CONSTRUCTION IS < 1 AC NO SWPPP REQUIRED; HOWEVER CONTRACTOR MUST PREVENT TRACKING OF SOIL ONTO PUBLIC ROADWAYS AND PROTECT AN EXISTING STORM WATER CATCH BASIN. CONTRACTOR MUST SWEEP UP SOIL OFF OF ADJACENT ROADWAY AND CLEAN OUT CATCH BASIN PRIOR TO FINAL APPROVAL FOR GRADING. A STABILIZED ROCK CONSTRUCTION ENTRANCE WAS INSTALLED. NO OTHER CONCERNS AT THIS TIME |