Permit: T09CM03238
Permit Details
Apply Date:
12/09/2009
Applicant:
N/A
Description:
INSTALL:SOLAR WATER HEATER
Contractors:
- GREEN ENERGY SOLAR INC (FN)
Permit Reviews
Permit Number - T09CM03238
Permit Status: Final
Permit Description: INSTALL:SOLAR WATER HEATER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/09/2009 | RESIDENTIAL BLDG/ZONING-WALKTHRU | 12/11/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM03238
Permit Status: Final
Permit Description: INSTALL:SOLAR WATER HEATER
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/09/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 12/09/2009 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
| 12/09/2009 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Final
Permit Number: T09CM03238
Permit Description: INSTALL:SOLAR WATER HEATER
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2009 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 1) SEAL ALL ROOF JACKS 2) PROVIDE SEPERATE TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING OR UP SIZE PER CORRECT DIAMETER TERMINATING AT 90 DEGREE DOWN TO DAYLIGHT 3) INSTALL TANK AND PANEL PER PLAN SUBMITTED AND ON SITE FOR STRUCTURAL SUPPORT OR PROVIDE CORRECT PLAN FOR THIS ROOF WHICH IS PITCHED |
| 12/23/2009 | ELECTRIC - FINAL | RRICH | Approved | IVRS - Inspection :* 1) NO ELECTRIC CIRCUIT ON THIS PROJECT |
| 12/23/2009 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 08/03/2010 | PERMIT FINALED | DQUINN | Approved |