Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/12/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #3 FOR STRUCTURAL SUPPORT OF PANEL AND TANK COMBINATION-YOUR PLAN CALLS FOR 4 X 4 SUPPORTS 72" OR 6' LONG YOU HAVE INSTALLED 48" OR 4' LONG ON A 24" ON CENTER ROOF SYSTEM 2) PAINT ALL INSULATION EXPOSED TO SUNLIGHT PER MANUFACTURES INSTALLATION INSTRUCTIONS 3) CONTRACTOR WILL BE CHARGED A REINSPECTION FEE FOR FAILURE TO FOLLOW PLANS OR INSTALLATION STANDARDS ON FUTURE NON COMPLIANT INSTALLATIONS 4) CONTRACTOR IS TO PAY REINSPECTION FEE AT 201 N. STONE PRIOR TO FINAL INSPECTION ON THIS SITE 5) NOTE: PLEASE BE SURE YOUR PLUMBING PAGE FOR YOUR INSTALLATIONS IS STAMPED BY CITY OF TUCSON PLAN CHECK AND IS THE PAGE IN THE PLAN FOR ACTUAL INSTALLATIONS AT A PARTICULAR SITE ON ALL FUTURE INSTALLATIONS |
|
| 12/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEAL ALL ROOF JACKS 2) PROVIDE SEPERATE TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING OR UP SIZE PER CORRECT DIAMETER TERMINATING AT 90 DEGREE DOWN TO DAYLIGHT 3) INSTALL TANK AND PANEL PER PLAN SUBMITTED AND ON SITE FOR STRUCTURAL SUPPORT OR PROVIDE CORRECT PLAN FOR THIS ROOF WHICH IS PITCHED |