Permit: T09CM03094
Permit Details
Apply Date:
11/24/2009
Applicant:
N/A
Description:
SOLAR WATER HEATER
Contractors:
- EXPERT SOLAR SYSTEMS
Outstanding Activity Conditions
Permit Number - T09CM03094
Permit Status: Final
Permit Description: SOLAR WATER HEATER
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/24/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 11/24/2009 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
| 11/24/2009 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Final
Permit Number: T09CM03094
Permit Description: SOLAR WATER HEATER
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2009 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 1) MAKE UP WATER HEATER VENT CONNECTION TO DRAFT HOOD PROPERLY 2) VENT CONNECTION TO WYE BRANCH TO BE MADE UP WITH LOWER PIPING INTO UPDER PIPING. REMOVE TAPE AND PROVIDE FASTENERS AT JOINTS 3) WHERE IS THE CHECK VALVE PER PLAN ? 4) SEAL INSULATION AT SEAMS 5) REMOVE PANEL DRAIN HANDLES OR PROVIDE HOSE BIB CAPS |
| 12/15/2009 | BUILDING - FINAL | RRICH | Approved | IVRS - Inspection :* |