Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/12/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* CORRECTIONS HAVE NOT BEEN DONE CORRECTLY: 1) VENT IS NOT OVER TOP OF DRAFT HOOD 2) VENT CONNECTION TO WYE BRANCH IS NOT PROPERLY CRIMPED AND CONNECTED AND TAPE HAS NOT BEEN REMOVED 3) CHECK VALVE IS NOT PER PLAN 4) INSULATION SEAMS NOT SEALED 5) CONTRACTOR TO PAY REINSPECTION FEE FOR NON COMPLIANCE AT 201 N. STONE PRIOR TO FINAL INSPECTION AND MAKE CORRECTIONS CORRECTLY |
|
| 12/15/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE UP WATER HEATER VENT CONNECTION TO DRAFT HOOD PROPERLY 2) VENT CONNECTION TO WYE BRANCH TO BE MADE UP WITH LOWER PIPING INTO UPDER PIPING. REMOVE TAPE AND PROVIDE FASTENERS AT JOINTS 3) WHERE IS THE CHECK VALVE PER PLAN ? 4) SEAL INSULATION AT SEAMS 5) REMOVE PANEL DRAIN HANDLES OR PROVIDE HOSE BIB CAPS |