Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T09CM02759
Permit Details
Apply Date:
10/14/2009
Applicant:
T J BEDNAR & COMPANY
Description:
SFR TJBE1810 T07-M0146
Contractors:
- T J BEDNAR & COMPANY
Permit Reviews
Permit Number - T09CM02759
Permit Status: Final
Permit Description: SFR TJBE1810 T07-M0146
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/19/2010 | REVISION - - 1ST | 01/21/2010 | COMPLETED |
01/21/2010 | REVISION - - 1ST | 02/03/2010 | COMPLETED |
02/03/2010 | REVISION - - 1ST | 02/12/2010 | COMPLETED |
02/12/2010 | OTHER | 02/18/2010 | COMPLETED |
10/14/2009 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 10/14/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM02759
Permit Status: Final
Permit Description: SFR TJBE1810 T07-M0146
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/14/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09CM02759
Permit Description: SFR TJBE1810 T07-M0146
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2009 | PLUMBING - ROUGH, SOIL | RFREIDIN | Approved | IVRS - Inspection :* 1) NOTE: NEED STAMPED HORIZONTAL WET VENT PLAN 2) NEED COMPACTION TEST AT REAR PORCH |
11/05/2009 | PLUMBING - SEWER HCS CONNECT | RFREIDIN | Approved | IVRS - Inspection :* |
11/05/2009 | PLUMBING - YARD WTR LINE/TEST | RFREIDIN | Approved | IVRS - Inspection :* |
11/17/2009 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | IVRS - Inspection :* 1) THIS LOT WAS REPINNED FOR PROPERTY LINE WEST SIDE PROPERTY LINE IS 12" WEST OF EXISTING P. WALL 2) COMPACTION REPORT WAS REQUIRED FOR AREA AT REAR PORCH, DO NOT POUR CONCRETE UNTIL COMPACTION REPORT IS OK'D |
11/17/2009 | ELECTRIC - UNDERGROUND | RFREIDIN | Approved | IVRS - Inspection :* |
11/17/2009 | ELECTRIC - UFER | RFREIDIN | Approved | IVRS - Inspection :* |
11/17/2009 | BUILDING PRE-SLAB | RFREIDIN | Approved | IVRS - Inspection :* |
12/09/2009 | ROOF NAILING | RFREIDIN | Approved | IVRS - Inspection :* |
12/09/2009 | EXT METAL CLIPS/EXT SHEATHING | RFREIDIN | Approved | IVRS - Inspection :* |
12/29/2009 | FRAMING | RFREIDIN | Approved | IVRS - Inspection :* 1) REMOVE MASTER SURROUND PANEL, CHECK H.D. AND NUT, NUT ON H.D. SAME WALL NOT TIGHTENED 2) NEED VERTICAL BACKING, MASTER SURROUND 3) NEED IRC PLUMBING PLAN 4) NEED SOLAR HEAT, OR H20 HEATER PLAN 5) LEAK AT MASTER IS FROM TEST CAP AT LAV |
12/29/2009 | ELECTRIC - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
12/29/2009 | PLUMBING - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
12/29/2009 | MECHANICAL - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
12/29/2009 | U VALUE FOR WINDOW | RFREIDIN | Approved | IVRS - Inspection :* |
12/29/2009 | STUCCO MESH | RFREIDIN | Approved | IVRS - Inspection :* |
01/11/2010 | SHEET ROCK NAILING | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | ELECTRIC - TEMPORARY SERVICE | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | ELECTRIC - CABLE DROP | RFREIDIN | Approved | IVRS - Inspection :* |
03/16/2010 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* 1) GROUNDING ON PANELS ALL OK |
03/17/2010 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED FOR "PHOTOVOLTAIC SYSTEM" PER R. MORENO-2ND TIME SENT TO TEP |
07/22/2010 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
07/27/2010 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
07/27/2010 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
07/28/2010 | PERMIT FINALED | JWEATHER | Approved |