Permit: T09CM01550
Permit Details
Apply Date:
06/17/2009
Applicant:
N/A
Description:
ADDITION: MASTER BEDROOM/MEDIA ROOM/BATHROOM
Permit Reviews
Permit Number - T09CM01550
Permit Status: Final
Permit Description: ADDITION: MASTER BEDROOM/MEDIA ROOM/BATHROOM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/17/2009 | PLANS OK TO SUBMIT - RES | 06/19/2009 | COMPLETED |
06/19/2009 | RESIDENTIAL BLDG/WWM | 07/22/2009 | COMPLETED |
07/22/2009 | RESUBMITTAL | 10/30/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM01550
Permit Status: Final
Permit Description: ADDITION: MASTER BEDROOM/MEDIA ROOM/BATHROOM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/17/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09CM01550
Permit Description: ADDITION: MASTER BEDROOM/MEDIA ROOM/BATHROOM
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2009 | PLUMBING - ROUGH, SOIL | RFREIDIN | Approved | IVRS - Inspection :* 1) OK TO POUR, LEAVE TRUNK CONNECTION OPEN OUTSIDE OF FORM 2) UPC 908.1 WET VENTING IS LIMITED TO TRAP ARMS |
11/05/2009 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | IVRS - Inspection :* |
11/05/2009 | BUILDING PRE-SLAB | RFREIDIN | Approved | IVRS - Inspection :* |
12/23/2009 | FRAMING | RFREIDIN | Approved | IVRS - Inspection :* 1) NEED T.J.I INFORMATION, TYPE SHOULD HVE A PRINT OUT FROM MANUFACTURE LISTING SIZE AND TYPE 2) MISSING HANGERS AT WEST WALL FRONT ROOM 3) ALL 6 X 6 HARDWARE POST/COL REQUIRED 16D COMMON TECO TYPE OR FULL 3 1/2" LONG |
12/23/2009 | BUILDING ABOVE CEILING | RFREIDIN | Approved | IVRS - Inspection :* |
12/23/2009 | ROOF NAILING | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - GAS PRESSURE TEST | RFREIDIN | Approved | IVRS - Inspection :* 1) NEED BTU RATING FOR ROOF UNIT TO EQUAL GAS RUN 2) 90' 3/4" GAS LINE/TRAC PIPIE 3) FGP-SS4-750 (RESEARCH) TRAC PIPE FOR SIZE |
01/20/2010 | PLUMBING - SEWER HCS CONNECT | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - YARD WTR LINE/TEST | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | ELECTRIC - UNDERGROUND | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | MECHANICAL - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
01/20/2010 | ELECTRIC - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
02/22/2010 | STUCCO MESH | EDURAZO | Approved | IVRS - Inspection :* |
03/13/2010 | SHEET ROCK NAILING | RFREIDIN | Approved | IVRS - Inspection :* |
04/27/2010 | MECHANICAL - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
04/27/2010 | PLUMBING - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
04/27/2010 | ELECTRIC - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
04/27/2010 | BUILDING - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |