Permit Details

Status:
Withdrwn
Type:
Grading and SWPPP
Address:
260 S CHURCH AV
Apply Date:
08/04/2009
Applicant:
RICK ENGINEERING
Description:
GRADING:TUCSON HOTEL & CONV. CENTER

Permit Reviews

Permit Number - T09BU01147
Permit Status: Withdrwn
Permit Description: GRADING:TUCSON HOTEL & CONV. CENTER
Start Date Submittal Complete Date Status  
03/11/2010 RESUBMITTAL - GRADING 03/11/2010 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T09BU01147
Permit Status: Withdrwn
Permit Description: GRADING:TUCSON HOTEL & CONV. CENTER
Total Outstanding Activity Conditions - 1
Date Name
08/04/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Withdrwn
Permit Number: T09BU01147
Permite Description: GRADING:TUCSON HOTEL & CONV. CENTER
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
GRADING - TIER REV N/A Not Inspected
06/01/2010 GRADING - FINAL N/A Correction Required CONTRACTOR NEEDS TO COMPLETE ALL SITE WORK PER APPROVED PLAN FOR GRADING APPROVAL.

1) COMPLETE STEM WALL BEING INSTALLED AT THE S/W CORNER OF NEW ENTRANCE
2) COMPLETE DEPRESSED LANDSCAPE AREA/DETENTION BASIN LOCATED OFF OF CUSHING ST.
3) REMOVE CONSTRUCTION DUMPSTERS
4) REMOVE PORT-O-LETS
5) REMOVE CONSTRUCTION FENCING
6) COMPLETE TRUNCATED DOMES INSTALLATION PER PLAN OR PROVIDE APPROVED REVISED DRAWING.
7) ALL AREAS DISTURBED BY CONSTRUCTION NEED TO BE STABILIZED.
8) PROVIDE APPROVED REVISED DRAWINGS (AS-BUILTS)

CONTRACTOR SHOULD COMPLETE THE ABOVE LISTED ITEMS AND CALL FOR RE-INSPECTION WHEN READY.

1. CONTRACTOR NEEDS TO STAKE ALL TREES PER STAKING NOTE 3.7 ON SHEET 34 OF DEVELOPMENT PACKAGE.
2. "GREEN BELT" OR TURF AREA OFF OF CHURCH NEEDS TO BE RESEEDED WHERE IT WAS DISTURBED.
3. VERIFY THAT LANDSCAPE BORDER OFF OF CUSHING HAS REQUIRED NUMBER/VARIETY OF PLANTINGS.
4. INFORMATION ON LARGE TREE THAT WAS REMOVED AND NOT REPLACED, FROM THE CORNER OF CHURCH/CUSHING NEEDS TO BE PROVIDED TO DSD INSPECTOR.
5. SMALL CACTI PLANTING AREA THAT WAS NOT INSTALLED PER APPROVED PLAN NEEDS TO BE REFLECTED ON AS-BUILTS.
6. ALL AREAS DISTURBED BY CONSTRUCTION NEED TO BE RE-STABILIZED (PARTICULARLY AREA DIRECTLY TO THE EAST OF CUSHING STREET ENTRANCE).

CONTRACTOR SHOULD COMPLETE THE ABOVE LISTED ITEMS AND CALL FOR RE-INSPECTION WHEN READY.

Completed Inspections

Permit Status: Withdrwn
Permit Number: T09BU01147
Permit Description: GRADING:TUCSON HOTEL & CONV. CENTER
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/31/2010 ENGINEERING PRE-CONSTRUCTION MCARREON Approved MET ON SITE WITH DAVE ROBERTS TO DISCUSS PLANS. NO CONCERNS AT THIS TIME.
06/01/2010 GRADING - INTERMEDIATE MCARREON Approved SEE NOTES UNDER FINAL GRADING.
06/01/2010 GRADING - REBAR MCARREON Approved
06/21/2010 GRADING - CHECK FOR ACTIVITY MCARREON Approved CONTRACTOR REQUEST TO SUBMIT AS-BUILTS ON PDF. REQURESTED DENIED. DIRECTED HIM TO ENGINEERING REVIEW FOR FURTHER OPTIONS.