Inspection History Details
Inspection Status: Correction Required
Inspection History: GRADING - FINAL
Permit Number - T09BU01147
Inspection Description - GRADING - FINAL
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/01/2010 | GRADING - FINAL | Correction Required | CONTRACTOR NEEDS TO COMPLETE ALL SITE WORK PER APPROVED PLAN FOR GRADING APPROVAL. 1) COMPLETE STEM WALL BEING INSTALLED AT THE S/W CORNER OF NEW ENTRANCE 2) COMPLETE DEPRESSED LANDSCAPE AREA/DETENTION BASIN LOCATED OFF OF CUSHING ST. 3) REMOVE CONSTRUCTION DUMPSTERS 4) REMOVE PORT-O-LETS 5) REMOVE CONSTRUCTION FENCING 6) COMPLETE TRUNCATED DOMES INSTALLATION PER PLAN OR PROVIDE APPROVED REVISED DRAWING. 7) ALL AREAS DISTURBED BY CONSTRUCTION NEED TO BE STABILIZED. 8) PROVIDE APPROVED REVISED DRAWINGS (AS-BUILTS) CONTRACTOR SHOULD COMPLETE THE ABOVE LISTED ITEMS AND CALL FOR RE-INSPECTION WHEN READY. 1. CONTRACTOR NEEDS TO STAKE ALL TREES PER STAKING NOTE 3.7 ON SHEET 34 OF DEVELOPMENT PACKAGE. 2. "GREEN BELT" OR TURF AREA OFF OF CHURCH NEEDS TO BE RESEEDED WHERE IT WAS DISTURBED. 3. VERIFY THAT LANDSCAPE BORDER OFF OF CUSHING HAS REQUIRED NUMBER/VARIETY OF PLANTINGS. 4. INFORMATION ON LARGE TREE THAT WAS REMOVED AND NOT REPLACED, FROM THE CORNER OF CHURCH/CUSHING NEEDS TO BE PROVIDED TO DSD INSPECTOR. 5. SMALL CACTI PLANTING AREA THAT WAS NOT INSTALLED PER APPROVED PLAN NEEDS TO BE REFLECTED ON AS-BUILTS. 6. ALL AREAS DISTURBED BY CONSTRUCTION NEED TO BE RE-STABILIZED (PARTICULARLY AREA DIRECTLY TO THE EAST OF CUSHING STREET ENTRANCE). CONTRACTOR SHOULD COMPLETE THE ABOVE LISTED ITEMS AND CALL FOR RE-INSPECTION WHEN READY. |