Permit: T09BU01106
Permit Details
Apply Date:
07/29/2009
Applicant:
JOHN HUACO
Description:
GRADING FOR ROOM ADDITIONS, BASKETBALL COURT FOR NEIGHBORHOOD CENTER
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T09BU01106
Permit Status: Final
Permit Description: GRADING FOR ROOM ADDITIONS, BASKETBALL COURT FOR NEIGHBORHOOD CENTER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/29/2009 | PLANS OK TO SUBMIT - GRADING | 08/07/2009 | COMPLETED |
08/07/2009 | GRADING | 09/14/2009 | COMPLETED |
10/08/2009 | RESUBMITTAL - GRADING | 10/26/2009 | COMPLETED |
11/12/2009 | RESUBMITTAL - GRADING | 11/18/2009 | COMPLETED |
11/20/2009 | RESUBMITTAL - GRADING | 04/20/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01106
Permit Status: Final
Permit Description: GRADING FOR ROOM ADDITIONS, BASKETBALL COURT FOR NEIGHBORHOOD CENTER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/29/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01106
Permit Description: GRADING FOR ROOM ADDITIONS, BASKETBALL COURT FOR NEIGHBORHOOD CENTER
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2010 | LANDSCAPE INSPECTION | MCARREON | Approved | |
10/14/2010 | ENGINEERING PRE-CONSTRUCTION | MCARREON | Approved | DID FOLLOW-UP PHONE CALL WITH G.C. LYLE(977-8206) WITH TRIUPH BUILDERS TO ENSURE THAT HE HAD RECEIVED THE INFO. REGARDING SIDEWALK CONCERNS. |
10/20/2010 | GRADING - CHECK FOR ACTIVITY | MCARREON | Approved | MET WITH LYLE TO DISCUSS PROPOSED CHANGES TO WALKWAYS. CHANGES WILL BE SUBMITTED AS ASBUILTS. HANDRAILS WILL BE NECESSARY. CHANGES APPROVED BY COT REP. OCTAVIO SANTAMARIA. |
11/04/2010 | GRADING - INTERMEDIATE | DROBERTS | Approved | CONTACTED HOHN HUACO AND ASKED THAT HE PROVIDE US WITH COPIES OF THE MODIFIED SIDEWALK SHEETS SO THAT WE CAN PLACE THEM IN THE PROJECT FILES. |
12/07/2010 | GRADING - TIER REV | JFEMLING | Approved | Revisions have been made to the sidewalks in front and rear of building to meet ADA standards, contractor has a revised plan from site eng. but has not been approved by PDSD. |
12/07/2010 | GRADING - FINAL | JFEMLING | Approved | Talked to contractor about what needs to be completed prior to C of O and Temp C of O. For temp C of O; Separate all construction activity from public with construction fence, remove all debris from the parking area and sidewalks that will have access to the building, raise HC parking signs to 7ft. All items on the approved plans must be complete and all revisions shown on a revised grading plan prior to final C of O and final grading approval. |
01/24/2011 | GRADING - REBAR | JFEMLING | Approved | |
05/20/2011 | PERMIT FINALED | KMEDINA | Approved |