Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/15/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
Approved |
| 10/14/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Correction Required |
DID FOLLOW-UP PHONE CALL WITH G.C. LYLE(977-8206) WITH TRIUPH BUILDERS TO ENSURE THAT HE HAD RECEIVED THE INFO. REGARDING SIDEWALK CONCERNS. |
| 10/13/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Correction Required |
STOPPED BY SITE FOR COURTESY VISIT. CONCERNED ABOUT SIDEWALKS THAT ARE FORMED. FRONT SIDEWALK AND BLDG. APPROACH AND REAR SIDEWALK AND BLDG. APPROACH DO NOT APPEAR TO BE WITHIN ADA REQUIREMENTS. DAVE ROBERTS WILL STOPPED BY SITE TO VERIFY INFO. AND SPOKE WITH CITY PROJECT ENGINEER. THEY ARE AWARE OF THE ISSUE AND ARE WORKING TO RESOLVE IT BEFORE SIDEWALKS ARE POURED. |
| 06/24/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
WORK CONTINUES ON EXPANSION. NO CONCERNS AT THIS TIME. |
| 06/02/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
PRE CONSTRUCTION MEETING. |
| 03/16/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ACTIVITY AT THIS TIME. |