Permit: T09BU01057
Permit Details
Apply Date:
07/17/2009
Applicant:
TALAVER ENG.
Description:
GRADING FOR LA PALOMA SCHOOL
Contractors:
- AL SANTA MARIA DESIGN AND CONSTRUCTION
Permit Reviews
Permit Number - T09BU01057
Permit Status: Final
Permit Description: GRADING FOR LA PALOMA SCHOOL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2009 | PLANS OK TO SUBMIT - GRADING | 07/17/2009 | COMPLETED |
| 08/04/2009 | GRADING | 09/03/2009 | COMPLETED |
| 09/04/2009 | RESUBMITTAL - GRADING ALL | 10/29/2009 | COMPLETED |
| 10/29/2009 | RESUBMITTAL - GRADING ALL | 11/18/2009 | COMPLETED |
| 11/18/2009 | RESUBMITTAL - GRADING ALL | 09/07/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01057
Permit Status: Final
Permit Description: GRADING FOR LA PALOMA SCHOOL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/17/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01057
Permit Description: GRADING FOR LA PALOMA SCHOOL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2009 | NPPO PRE PERMIT INSPECTION | JLINVILLE | Approved | |
| 12/22/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | SITE IS < 1 AC, NO SWPPP REQ. 1) PROVIDE A COPY OF CHANGES MADE FROM TYPE II SCUPPER TO TYPE III. 2) PROVODE CLARIFICATION ON WHAT SITE WORK IS EXISTING AND WHAT WILL BE CONSTRUCTED PER THE APPROVED PLANS - NEW SITE CONSTRUCTION IS SHOWN AT PARKING AREA NEAR SCHOOL. 3) SITE HAS NO SWPPP; HOWEVER CONTRACTOR MUST MAKE EVERY EFFORT TO KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION. 4) CALL FOR INSPECTION PRIOR TO POURING OF CONCRETE SIDE WALK. |
| 12/31/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | CONTRACTOR POURING CONCRETE FOR SCUPPERS. PRIOR TO FINAL APPROVAL PROVIDE AN APPROVED PLAN SHOWING WHAT WAS CONSTRUCTED |
| 02/03/2010 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
| 02/09/2010 | GRADING - FINAL | MRUSSO | Approved | ALL CONSTRUCTION IS COMPLETED PER THE APPROVED AS-BUILT PLAN, AWAITING BASIN CERT LETTER |
| 02/09/2010 | GRADING - TIER REV | MRUSSO | Approved | |
| 02/10/2010 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
| 06/26/2019 | GRADING - REBAR | RLEDONNE | Approved |