Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | SITE IS < 1 AC, NO SWPPP REQ. 1) PROVIDE A COPY OF CHANGES MADE FROM TYPE II SCUPPER TO TYPE III. 2) PROVODE CLARIFICATION ON WHAT SITE WORK IS EXISTING AND WHAT WILL BE CONSTRUCTED PER THE APPROVED PLANS - NEW SITE CONSTRUCTION IS SHOWN AT PARKING AREA NEAR SCHOOL. 3) SITE HAS NO SWPPP; HOWEVER CONTRACTOR MUST MAKE EVERY EFFORT TO KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION. 4) CALL FOR INSPECTION PRIOR TO POURING OF CONCRETE SIDE WALK. |
|
| 12/18/2009 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO CONTACT ON SITE, LEFT MESSAGE W/CONTRACTOR |